Jl1L-20-2001 FRI 03;19 PM FAX N0. P, 02/12
<br />•}ul 2D 01 11:54a PiiOfVIR RflnGER DISTRICT 970-527-x152
<br />• IREVIS&~ 3-9-95) P• 11
<br />CONTROLLSO SERPACB 45S STIPIILATION
<br />9LOPSS SO-60~
<br />
<br />Surface oeeupanry or use ie subject eo the folloaiag spacial oparati.ag
<br />eoaatrainta.
<br />.Special interdisciplinary team analysis and mitigation plans detailing
<br />fifiitsily,eti.an:, and .mitigatidn. techniques. xill be zequired~ oa areas vita;
<br />slopes ranging P=Cm~40'-.60~:~' (The interdisciplinary team could include
<br />engineering, s4i1 scientist, hydrologist, landscape architect, Teclamation
<br />specialist sad coal mining engineer.) '
<br />Mitigation may include, but is not limited te, use of erosion control
<br />cloths, macs, geoaeb soil support materials, lifeing and saving local
<br />native vegetation is chu3tks of sod to•be later plsced over disturbed areas,
<br />reseeding disturbed banks with stabilizing seed •mix, .use of 'chemical
<br />stabilizers, eackifiers and blapJCets sad careful design o~ surface water
<br />flaw, •. ~ _
<br />oa lands, deacribad below:
<br />' liort~i0iis of bet. 21, 29, 29, (SO-SLM) , 32,, 33, 34, T133, k90H, sad •partions
<br />' o£ sac.3, a, 9, 10, S14S, R9oX, 6tk,PM'with slopes .40-6pt as generally
<br />• delineated oa the ateached•map prepared by Michael X. Ward dated 32-19-~s,
<br />• The map is•foz planning purposes aaly; Ia We event of any conflict between
<br />• written.,elauses of th}s seipulation and the.' map, tha stipulation eJ.ausee
<br />' shall eb¢trol_''AL•1 National Forest Systew and eureau'oE Laad~ Maaagem®at
<br />' loads wYk?ain thn loasebold~whieh•bave .slopes ranging Isom 40-hot'falls •
<br />'~ tinder jyrisdieticn of this stipulaticn_• •-
<br />' .. _
<br />.8or tbe,purpoee ot: .• _ '
<br />' Minimizing potential Eor soil lass, mace Sand mavemeaC,• tavegetation .,
<br />failure sad uuaecepeable visual impairmmt. •~ '
<br />_ It may became necessary fora valuer, esceptiou or• modif£eacion (HEM) co
<br />• this stipulation for the operator/lessee to •uee •the kusfaee~ in the area
<br />~•• covered by Chia stlpu]atioa to allow for t??e zeeovery bf the coal reserve.
<br />' Wffi•t's to this stipulation rill be considered Daly at the time aperation9 '
<br />are praDosed, sad will be subject to the Forast Laad sad Resource
<br />Management Plaa an effect at the~time of consideration, sad rill be cubjeee
<br />to applicable regulatory and eavironme21ta1 compliance' requiremenCs.
<br />' Graneing of a NEM is a Purest Sezviee' discretionary action which tde
<br />operator should nae.routinely erpeec. The Forest Service renezves the '
<br />sighs to impose other acipulationc in the same area of this les.ahold if a
<br />' H8M is granted,
<br />• slay changes to this eeipulotiaa will bo made is ~secardance with tha land usa
<br />plea, sad/ar~ the regnlntozy provisigna for, such ehaagea.• (Pat guidance ae .~~the
<br />usa of this ativulatioa, sea HLa N,aaual 1626 sad 3400, as B3 Menusl SaS,o 'sad
<br />.2820.1
<br />Coal-CSU 40-60 2/95
<br />
|