Laserfiche WebLink
Act, C.R.S. 1973, as amended, 34-33-101 et seg., ana the keguian onn <br />promulgated pursua~to t Act. . <br />The permit application an~the stipulations will become a ding part of the <br />permit upon approval. The stipulations for the Energy Mine No. 3 are as <br />follows: <br />Stipulation No. 1 <br />WITHIN 30 DAYS OF PERMIT ISSUANCE THE <br />GROUND WATER QUALITY INFORMATION FROM <br />008-77-43, 008-79-7, AND 008-FM-6 INTO <br />Stipulation No. 2 <br />PERMITTEE MUST SUBMIT ALL HISTORICAL <br />DEEP AQUIFER MONITOR WELLS <br />THE PERMIT APPLICATION. <br />INSTANTANEOUS FLOW MEASUREMENTS FOR BOTH UPSTREAM SURFACE WATER MONITOR <br />SITES ON MIDDLE AND FOIDEL CREEKS MUST BE OBTAINED AT THE APPROXIMATE TIME <br />OF WATER QUALITY SAMPLE COLLECTION. THESE FLOW DATA MAY BE EXTRACTED FROM <br />CONTINUOUS FLOW RECORDS AT U.S.G.S. GAGING STATIONS 09243700 AND 09243900 <br />TO THE EXTENT WHICH THEY WILL BE AVAILABLE. HOWEVER, IF FOR ANY REASON <br />(OTHER THAN NO FLOW) 7HE U.S.G.S. DOES NOT COLLECT THIS INFORMATION OR IS <br />NOT ABLE TO FORWARD THIS INFORMATION TO THE PERMITTEE IN A TIMELY MANNER, <br />IT WILL BE 7HE RESPONSIBILITY OF THE PERMITTEE TO COLLECT AND REPORT IT TO <br />THE DIVISION WITHIN THE PERMITTEE'S ANNUAL HYDROLOGIC MONITORING REPORT. <br />Stipulation No. 3 <br />CYCC IS MONITORING WATER QUALITY AT UPSTREAM SITE 18 ON MIDDLE CREEK <br />ACCORDING TO THE SCHEDULE IN TABLE B OF EXHIBIT 15. THE DIVISION DIRECTS <br />THAT THE PERMITTEE ALSO MONITOR WATER QUALITY ON FOIDEL CREEK UPSTREAM OF <br />THE MINE ACCORDING TO THE SAME SCHEDULE. THIS MONITORING SITE MUST BE <br />LOCATED UPSTREAM NEAR THE WESTERN PERMIT BOUNDARY AND MAP 4A MUST BE <br />REVISED WITHIN 30 DAYS OF PERMIT ISSUANCE TO SHOW THE LOCATION. THE <br />MONITORING INFORMATION FROM FOIDEL CREEK SHALL 8E INCLUDED IN THE <br />PERMITTEE'S ANNUAL HYDROLOGIC MONITORING REPORT TO THE DIVISION. <br />Stipulation No. 4 <br />INSTANTANEOUS STREAMFLOW MEASUREMENTS SHALL 8E OBTAINED AND RECORDED BY <br />THE PERMITTEE AT THE SAME TIME THAT WATER QUALITY SAMPLES ARE COLLECTED AT <br />SITE 29 ON MIDDLE CREEK AT A MINIMUM DURING THE MONTHS FROM JUNE THROUGH <br />OCTOBER. THESE FLOW MEASUREMENTS SHALL 8E INCLUDED IN THE PERMITTEE'S <br />ANNUAL HYDROLOGIC MONITORING REPORT. <br />Stipulation No. 5 <br />WITHIN 60 DAYS OF PERMIT ISSUANCE, THE <br />RECLAMATION TIMETABLE UNDER RULE 2.05. <br />INCLUDE RECLAMATION AND RESTORATION OF <br />7HE MIDDLE CREEK MINE OFFICE COMPLEX. <br />Stipulation No. 6 <br />PERMITTEE MUST AMEND THE <br />4 OF THE PERMIT APPLICATION TO <br />THE DISTURBED AREA ASSOCIATED WI 7H <br />THE PERMITTEE SHALL SUBMIT THE DESIGN FOR THE HAUL ROAD DRAINAGE DITCHES <br />AS A TECHNICAL REVISION TO 7HE DIVISION FOR APPROVAL PRIOR TO CONSTRUCTION. <br />x3 <br />M'" <br />~,~, ~C <br />