Laserfiche WebLink
F1~D HAZARD DEVELOPMENT PERMI • <br />CERTIFICATION <br />I certify that the following standards have been met: <br />Check aoolicable sectior~s only <br />~_ Tlie lowest floor, including the basement floor, is elevated (For existinf <br />structures which are being substantially improved) or will be t~~ii It (Cot <br />new structures) to the level, or above, of ttie regulatory flood datum. <br />Water Surface Elevation of the Intermediate Regional Flood is:478s.n <br />feet above MSL at the building site. <br />Elevation of the locoest floor of the proposed structure is4786.Ofeet above <br />MSL at the building site. <br />NA The mobile home pad. is elevated (for existing structures wtiicli are beinf <br />substantially improved) or will be built (for new structures) Co rl,e level, <br />or above, of the regulatory flood datum. <br />Water Surface Elevation of the Intermediate Regional Flood is: <br />feet above MSL at tl~e building site. <br />Elevation of the mobile home pad is feet above MSL at the building <br />site. <br />NA Ttie lowest floor of the manufactured home, including the basement float, is <br />elevated (for existing structures which are being substantially improved) <br />or will be built (for new structures) to the level, or above, of the <br />regulatory flood datum. <br />Water Surface Elevation of clie Intermediate Regional Flood is: <br />feet above P1SL at the building site. <br />Elevation of Clio lowest floor of the manufactured home is feet <br />above HSL at the building site. <br />F1.00DWAY MAP N0. 080266-0001 (SEPT 27, 1991) AND <br />Source of Information: Fi:RM 080266-0605-D (SEPT. 27, 19915 AND <br />ACTUAL FIELD_SURVEY~BY McRAE & SHORT, INC., MAY 6. 1994 <br />Structures which are not elevated in order to be floodprooEed are designo~i <br />so Clio structure is wacertigfit below the elevation of the regulatory flood <br />datum and the structures are. designed to be capable of resisting the <br />Hydrostatic and hydrodynamic forces expected at the building site during an <br />intermediate regional flood. <br />eater Surface Elevation of the Intermediate Regional flood is: feet <br />above MSL at r.he building site. <br />Elevation to which structure is to be floodproofed and watertight: <br />feet above MSL at the building site. <br />Source of Information: <br />