Laserfiche WebLink
<br /> <br />condition (Stipulation No. 26) that a map be submitted accurately <br />depicting the location and acreage of mining areas bond release <br />blocks with dates of surety release. The release would reduce the <br />bond amount 60$ of the original bond. The findings document <br />states that the remaining bond amount is sufficient to assure the <br />completion of the remaining reclamation work if the work had to <br />be performed by the Division should those areas fail. The <br />remaining reclamation work includes the reclamation of ponds M, <br />H, and K, topsoil and re-seed approximately 5 acres at the <br />dragline dismantling site, revegetation of the entire reclaimed <br />area and maintaining the site for the duration of the liability <br />period. <br />The proposed .Phase I bond release will not conflict with federal <br />lease terms and, therefore, BLM has no objection to the Phase I <br />bond release for these areas. <br />If you have any questions, please contact Janet Hook at (970)824- <br />4441. <br />