Laserfiche WebLink
<br />. ~, <br />14300 Highway 12 <br />Weston, Colorado 81091 <br />(719)868-2761 <br />FAX (719)868-2275 <br />BASIN <br />RESOURCES, ~N~. <br />a subsidiary of ENTECH, Inc. <br />Mr. Joseph Dudash <br />Reclamation Specialist <br />office of Mined Land Reclamation <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />RE: Request for NOV Abatement Date Extension <br />New Elk Mine Permit No. C-81-012 <br />Dear Mr. Dudash: <br />iii iiiiiiiiiiiii iii <br />999 <br />July 2, 1993 <br />~. <br />RFCFIVF(~ <br />JUN 2 5 1993 <br />Division of Miue,eis ti u~.,,~yy <br />Due .to the large quantity of remedial work required by the <br />NOV's issued during the April 5 through 9 and April 12 through 16 <br />inspections, a contractor has been retained and has been working <br />seven days per week. Therefore Basin Resources, Inc. (BRI) <br />requests-an abatement time extension from June ll to July 8 for <br />certain NOV's and to July 15 for certain others. Following is a <br />listing of those NOV's: <br />For July 8 Abatement: <br />C-93-034 Final additions ancl.line clearing is underway. <br />C-93-035 Most work on cleaning culverts and drop inlet No. <br />2 has been completed. A ser*.i:cn of culvert has been ordered to <br />close the open inlet center o1' C5. Work on cleaning remaining <br />culverts and attempting to locate the outlet of. the "fireplug" <br />culvert and open the D26 to river culvert is underway. <br />C-93-036 All upland diversion ditches have been cleaned, <br />reshaped and increased in cross section to design. Most other <br />listed ditches have been reworked or newly cut. Remaining work <br />is in progress. <br />C-93-038 Revisions have been submitted to remove culverts <br />no longer required or in service. Culvert C40 has been installed <br />and C13 will be removed. <br />C-93-039 A culvert has been installed i <br />spillage east of the silos nas been craned. <br />contaminated soil have been placed in drums. <br />submitted to the processor for evaluation and <br />for shipping. Cleaning of the windb~own coal <br />n D11. Coal <br />Spilled oil and <br />Samples have been <br />directions to BRI <br />is in progress. <br />