My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-08-20_ENFORCEMENT - C1982056
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1982056
>
1993-08-20_ENFORCEMENT - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2021 2:22:32 PM
Creation date
11/21/2007 10:39:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Enforcement
Doc Date
8/20/1993
Doc Name
FOIDEL CREEK MINE PN C-82-056 SETTLEMENT AGREEMENT NOV C-93-078 & C-93-079
From
CYPRUS YAMPA VALLEY
To
DMG
Violation No.
CV1993078
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> I <br /> CYCC objected to the penalty, because they did not feel the NOV <br /> was intentionally caused. The site conditions have been very <br /> unpredictable this spring. Some days it had been very wet, <br /> obviously making it difficult to get around. Other days were dry <br /> and access was possible. Some days conditions appeared dry, but <br /> once out in the field, it was wetter than it appeared. The <br /> personnel and contractors that caused these NOV's were <br /> experienced at the mine, but they misjudged the conditions. They <br /> did not intentionally cause the NOV's. <br /> Based on the information presented, I see no evidence to indicate <br /> the NOV's were intentional. I am reducing this to $500.00 <br /> representing mid-level negligence. <br /> Good Faith <br /> The NOV was written on a Friday afternoon. On Saturday the <br /> operator brought in a crew of three people to hand rake and seed <br /> the disturbance at Pond B. At Pond T, the operator abated the NOV <br /> by July 13. This was the shortest time possible given the wet <br /> conditions in the area. If the NOV were abated sooner greater <br /> harm could have been done. <br /> I believe the NOV was abated in the shortest time possible. An <br /> extraordinary effort was undertaken at Pond B to abate the NOV <br /> the next day. I propose a $250.00 reduction for good faith. <br /> Settlement Agreement Penalty Proposed $800.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.