Laserfiche WebLink
~..ti <br />NOTICE OF PROPOSED DECISION <br />COAL <br />The Colorado Mined Land Reclamation Division has issued a proposed <br />decision on April 5, 1983, approviny with a stipulation a technical <br />revision to Wyoming Fuel Company's permit # C-026-81 to incorporate a <br />rail load-out facility at Walden, Colorado under the provisions of the <br />Colorado Surface. Coal Mininy Reclamation Act of 1479. The proposed <br />revision was submitted by Wyoming Fuel Company, 445 Union Blvd., Suite <br />310, Lakewood, CO 80228,Telephone (303) 989-5037, for their rpoposed <br />load-out located in the NEl/4 of Sec.29, T9N, R79W in Jackson County, <br />Colorado. The affected area can be located at the junction of State <br />Highway 14j125 and the Union Pacific Railroad tracks immediately west of <br />the Walden city limits. <br />The revision incorporates an existing 4.43 acre rail load-out into the <br />coal mining and reclamation permit. This revision will not require <br />adjustment of the reclamation bond. <br />Copies of the proposed decision are available at the Colorado 1~lined Land <br />Reclamation Division, Centennial Building Room 423, 1313 Sherman St., <br />Denver, CO. 80203. Telephone (303) 866-3567 and the office of the Jackson <br />County Planner, located in Walden, Colorado. Any person who has an <br />interest which is, or inay be, adversely affected may request a formal <br />hearing regarding ttris proposed decision. Requests for a formal hearing <br />must be made in writing ~aithin ten (10) days of this puUlication (by 5:00 <br />Pi~7 April 15, 1983) and shall.state with reasonaole specificity the <br />reasons for the request and the objections to the proposed decision. <br />Document # 2110E <br />