My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE24222
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE24222
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:07 PM
Creation date
11/21/2007 10:39:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Enforcement
Doc Date
8/14/1996
Doc Name
COMMENTS REGARDING NOV
From
DMG
To
FILE
Violation No.
CV1996016
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiiiiiiiiii iii <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmem o(Nalural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colurado 80203 <br />Phone. 1303) 866-3567 <br />FA%: (J03) 83?8106 <br />MEMO TO FILE <br />DATE: August 14, 1996 <br />FILE NO: C-94-082/NOV File C-96-016 <br />FROM: Erica Crosby~~ <br />RE: Comments regarding NOV <br />~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Goaernor <br />James 5. Lochhead <br />ExeNlrve DueUOr <br />nnichael B. Long <br />Drvi¢ion Dveaor <br />On July 31, 1996 NOV C-96-016 was issued to the Yoast Mine (C-94-082). A road <br />approximately 12 feet wide and 3200 feet long was constructed to topsoil pile D. The road <br />branched off Haul Road B at YP-6 culvert and up the hill to topsoil pile D. This road was <br />not included in the approved permit. The operator removed a portion of the Haul Road <br />B from approximately station 60+00 to the coal mining recovery line where the haul road <br />turns into a ramp. A portion of the 3200 foot road will be within the coal recovery area <br />(roughly 2000 feet). The remaining 1200 feet is outside the coal recovery line and is <br />designated as a light use road. The violation was written for; <br />Failure to describe the light use road leading to topsoil pile D in the permit-~ <br />Failure to design the light-use road leading to topsoil pile D and have it approved <br />prior to construction. <br />Abatement of the violation required that Seneca submit a revision to the Division describing <br />the light use road leading to topsoil pile D. The violation was terminated on August 9, <br />1996. <br />c: \wp51 \seneca\960814a <br />
The URL can be used to link to this page
Your browser does not support the video tag.