Laserfiche WebLink
sheet 1 of 2 <br /> Colorado Division of Minerals and Geology <br /> ----------------------------------------- <br /> ESTIMATING FORM - STRUCTURAL DEMOLITION WORK <br /> ............................................ <br /> Task No. : 1 Prepared by CLK <br /> Permit No.: M-83-052 Filename M052-1 <br /> Date 25-Nov-97 Operation Joker Mine <br /> __________________ __,__--_--_________-------_____- <br /> Permitting action Recalculation of financial warranty <br /> _______________________________________________________________________________________________________ <br /> Task description Demolition of buildings <br /> ---------------________________________________________________________________________________________ <br /> MEANS Location Adjustment: 105.50% of base unit costs - MEANS SITE WORK 6 LANDSCAPE COST DATA 1995 Edition <br /> __________________ _------_- <br /> I MEANS BASEI ADJUSTED <br /> STRUCTURE / FACILITY / EQUIPMENT DESCRIPTION I DIMENSIONS I COMPOSITION QUANTITY UNIT I UNIT COST TOTAL COST <br /> .............................................. ------....------.------- ---.---...... .......... ........I----------- ----------.. <br /> Building 1 101250 I Steel 101,250 CF $0.17 $18,159 <br /> 6750 I Concrete 6,760 I SF $6.02 $42,870 <br /> 330 Concrete 330 I LF $8.27 $2,879 <br /> I I I I I I <br /> Building 2 101250 I Steel 101,250 I CF $0.17 I $18,159 <br /> 6750 I Concrete 6,750 I SF $6.02 $42.870 <br /> 390 I Concrete 390 I LF $8.27 $3,403 <br /> I I I I I I <br /> Building 3 50625 I Steel 50.625 I CF $0.17 $9,080 <br /> I 3375 I Concrete I 3.375 SF $6.02 $21,435 <br /> I 240 I concrete I 240 I LF $8.27 $2,094 <br /> I I I I I I <br /> I I I I I I <br /> I I i I I I <br /> I I I I I I <br /> I I I I I I <br /> I I I I I I <br /> I I I I I I <br /> I I I I I I <br /> I I I I I I <br /> I I I I I I <br /> I I I I I I <br /> I I I I I I <br /> I I I I I I <br /> I I I I I I <br /> I I I I I I <br /> I I I I I I <br /> I I I I I I <br /> I I I I I I <br /> I I I I I I <br /> I I I I I I <br /> I I I I I I <br /> I I I I I I <br /> I I I I I I <br /> I I I I I I <br /> I I I I I I <br /> I I I I I I <br /> TASK SUBTOTAL - sheets 1s.s '$160,949 <br />