Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981015
IBM Index Class Name
Enforcement
Doc Date
5/15/1991
Doc Name
COMBINATION SPILLWAYS RULE 4.05.6
From
MLRD
To
COAL MINE PERMITTEES
Violation No.
CV1991038
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~II ~II~~~II~~~~~~I~ <br />~~ . <br />~. <br />STATE OF COLORADO <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1313 Sherman St.. Room 215 <br />Denver, CO 80203 <br />303 866-3567 <br />Fax: 303 832-6106 <br />DATE: May 15, 1991 <br />T0: Coal Mine Permittees ~~ <br />FROM: Steven Rennet '~ :~ <br />RE: Combination Spillways (Rule 4.05.61 <br />Op [O~~ <br />„° i <br />ti~' .. <br />•~n• <br />x/876 <br />Roy Romer, <br />Govertror <br />Fretl R. Banta. <br />Division Director <br />The Colorado Rules and Regulations for Coal Mining (4.05.61 have been modified <br />to reflect recent changes in the federal regulations. As you mdy know, the <br />state petitioned fora grandfather clause in the federal regulations, but was <br />rejected. The new regulations require that principal and emergency spillways <br />be separated, unless they are configured as an armored open channel. <br />A number of ponds which currently route primary and emergency discharges <br />through a single, enclosed spillway are impacted by this Rule change. Ponds <br />with this type of spillway will need to be reconfigured to meet this new <br />criteria. <br />Affected permittees will need to submit technical revisions to their permits <br />which incorporate these design changes. The revision should meet the design <br />criteria of Rule 4.05.6. Revisions should be submitted such that <br />on-the-ground construction is completed by no later than September 1, 1991. <br />We regard this date as a final implementation deadline, barring serious, <br />unforseen circumstances. <br />If you have questions or comments regarding either appropriate design <br />standards or the technical revision process, please feel free to contact the <br />lead specialist for your mine. <br />SGR/yjb <br />cc: David Cole, CMA <br />MLRD Coal Staff <br />5111E <br />