Laserfiche WebLink
INSERTION INSTRUCTIONS <br />YOAST MINE <br />PERMIT C-92-082 <br />TECHNICAL REVISION (TR-30) <br />May 21, 2007 <br />TAB 13. Facilities. Vol. 6A <br />• Attachment 13-3A, Pond 10 As-Built Repozt -replace text pages 13-3A.i and 13-3A.3 through 13- <br />3A.6 <br />• Attachment 13-3A, Pond 10 As-Built Report -insert new attachment 13-3A-1 behind attachment <br />test <br />• Attachment 13-3A, Pond 10 As-Built Report -replace Addendum 13-3A-A pages 13-3A-A.1 <br />through 13-3A-A.16 (10-Yeaz, 24-Hour Storm Event SEDCAD Demonstration) <br />• Attachment 13-3A, Pond 10 As-Built Report -replace Addendum 13-3A-B (25-Year, 24-Hour <br />Storm Event SEDCAD Demonstration) <br />• Attachment 13-3A, Pond 10 As-Built Report -replace Addendum 13-3A-C (100-Yeaz, 24-Hour <br />Storm Event SEDCAD Demonstration) <br />• Attachment 13-12, Drainage and Sediment Control Plan -replace text pages 3, 4, 7B, 7C, 7D and 8 <br />• Attachment 13-12, Drainage and Sediment Control Plan, Figure 13-12.3C -insert Figure 13-12.3C <br />(page 13-12.13A) behind page 13-12.13 <br />• Attachment 13-12, Drainage and Sediment Control Plan -insert new Appendix 13-12.A, Tuxf <br />Reinforcement Mat Design and Installation Information behind page 13-12.13A <br />• Attachment 13-12, Drainage and Sediment Control Plan, Figure 13-12.3-1C -insert Figure 13-12.3- <br />1C (page 13-12.3-3A) behind page 13-12.3-3 <br />• Appendix 13-12, Drainage and Sediment Control Plan, Appendix 13-12.3, Postmining Channel <br />SEDCAD4 Results -insert pages 13-12.152A and 13-12.152B (Postmine Channel YPM-15 TRM <br />Designs) <br />• Appendix 13-12, Drainage and Sediment Control Plan, Appendix 13-12.3, Postmining Channel <br />SEDCAD4 Results -replace pages 13-12.3-180 and 13-12.3-181 (Posttnine Channel YPM-20) <br />• Exhibit 13-4A, As-Built Pond 10 -replace existing exhibit <br />