Laserfiche WebLink
<br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1373 Sherman St.. Room 215 <br />Denver, CO 80203 <br />303 8663567 <br />FAX~303 832-8106 <br />December 20, 1991 <br />Ms. Phyllis Ary <br />A & S Construction Co. <br />P.O. Box 566 <br />Canon City, CO 81212 <br />,STAT~OF <br />999 <br />•JP <br />COLORADO <br />Of ~OCp <br />R~'~' ~> <br />„e ~~~ <br />•~ "~v' , <br />~ re 76 ~ <br />Ray Romer. <br />Governor <br />Fred R. Banta. <br />Division Director <br />Re: A & S Construction Company, Demetrio and Olive Valdez, File No. M-91-133 <br />Dear Ms. Ary: <br />It has come to our attention that you may have conducted an unpermitted mining <br />operation on the west side of the Rio San Antonio, about one mile south of <br />Antonito, Colorado, on the above-cited property. The Colorado Mined Land <br />Reclamation Act, C.R.S. 34-32-101 et seg., and specifically, 34-32-109(7), as <br />amended, requires all persons who mine in Colorado obtain a reclamation permit <br />for their mining operation. <br />The Mined Land Reclamation Division has placed you and your operation on the <br />Mined Land Reclamation Board meeting agenda for consideration of possible <br />violation of the above mentioned statute. This meeting is scheduled for <br />January 22-23, 1992, in Room 318 of 1313 Sherman Street, Denver, Colorado, <br />commencing at 9:00 a.m. each day. Your matter will be heard during a Formal <br />Public Hearing as soon after commencement as possible. Please call this <br />office on Monday, January 20, 1992 for a more specific day and time. <br />During the Formal Public Hearing, the Board may issue or confirm a Cease and <br />Desist Order, consider possible civil penalties and corrective actions (if a <br />violation is found.) Civil penalties are levied pursuant to Article 32 of <br />Title 34, Section 123(2) and Section 123(3), which state: <br /><2) Any operator who operates without a permit shall be subject to a civil <br />penalty of not less than one thousand dollars per day nor more than five <br />thousand dollars per day for each day the land has been affected. Such <br />penalties shall be assessed for a period not to exceed sixty days. <br />Operators who mine substantial acreage beyond their approved permit <br />boundary may be found to be operating without a permit. <br />(3) Any operator or prospector who operates without filing a notice of intent <br />or a permit under Section 34-32-110 shall be subject to a civil penalty <br />of not less than fifty dollars nor more than two hundred dollars per day <br />for each day the land has been affected. Such penalties shall be <br />assessed for not less than one day and not more than sixty days. <br />Operators operating under a permit approved pursuant to Section 34-32-110 <br />who affect more than two acres may be found to be operating without a <br />permit. <br />