Laserfiche WebLink
<br />_2_ <br />CIVIL PENALTY (C.RS. 34-32.5-123) <br />~•1. Require the operator and/or landowner t~V pay a minimum civil penalty in the amount of <br />' l8`i ' $399.60, based on twelve 12 hours of staff time at $33.30/hour. <br />2. If the Board finds the operation to be an illegal Construction Material Extraction <br />Operation, the Board should also assess the operator and/or landowner a civil penalty of <br />not less than $1,000.00 per day nor more than $5,000.00 per day for each day the land <br />has been affected, not to exceed 365 days. <br />` ,~ a. In this case, the Office recommends that the Board find seventy three (731 <br />~,1 days of violation at $1.000.00 per day. <br />b. The total civil penalty of $73.399.60 (Nos. 1 & 2) is due 30 days from the <br />date of the signed Board Order. <br />c. The Office recommends that $ 2 07.00.00 of the total civil penalty be <br />suspended, if corrective actions are completed by 24 9 and the <br />`- Performance Warranty is posted by 3 25 96. <br />3. If the Board nds the operation to be an illegal Construction Material Exploration <br />Operation, the and should also assess the operator and/or landowner a civil penalty of <br />not less than $50. O.~er day nor more than $200.00 per day for each day the land has <br />been affected, not to exceed 60 days. <br />a. In this case tkie~Office recommends that the Board find n/a days <br />of violation at $ \~ n/a per day. <br />b. The total civil penalty n~a (Nos. 1 & 3) is due 30 <br />days from the date of the igned Board Order. <br />c. The Office recommends that n a of the total civil <br />penalty be suspended, if correct a actions are completed by n/a <br />and the interim bond is posted by n/a <br />a:\preform2.rco <br /> <br />u{' Fj eC ~nn~'~ i`"c' ~P,C, /~./c' T° (^.D 1. ~`~SJ T CD/1c~.~~~' ri t''0 <br />3~ ,~.( wcnr: cam- J, p /l\ v l L <br />/ ~ ~'~' h /T / ~~CL ~`w.'i'~..Y/~., / i ~.i tti.., n I..Q'1 `/ ~'c^-c.~~ c~ S J (^ i.._.v~ ` <br />