Laserfiche WebLink
Sheetl <br />wnK Drillling Sche dule <br />an oizool <br />01-Expl-Drl.xls <br /> 2001-23-1 2001-11-1 <br /> BBB EEE <br /> Start Duration Finish Start Duration Finish <br />Site Prep 3-Aug <br />Rigup & Surf Casing 9-Aug 1.0 10-Aug <br />Production Drill <br />rotary 11-Aug 3.0 14-Aug <br />core <br />Case and grout 14-Aug 1.0 15-Aug <br />Run 4.5" temp casing 15-Aug 0.5 15-Aug <br />Rigdown Drill Tech 15-Aug 0.5 16-Aug <br />Rigup LS-244 16-Aug 0.5 16-Aug <br />Core 300 ft 16-Aug 1.5 18-Aug Site Prep 15-Aug 2.0 17-Aug <br />Rigdown LS-244 18-Aug 0.5 18-Aug Move LS-244 and rigup 18-Aug 1.0 19-Aug <br />Rigup Drill Tech 18-Aug 0.5 19-Aug Set Surface Casing 19-Aug 0.5 19-Aug <br />Ream and drill to TD 19-Aug 0.5 19-Aug Core 19-Aug 3.5 23-Aug <br />Schlumberger log hole 19-Aug 1.0 20-Aug Schlumberger log 23-Aug 0.5 23-Aug <br />I/F Test w/ S-HRT 20-Aug 0.5 21-Aug I/F Test w/ S-HRT 23-Aug 0.5 24-Aug <br />Set bottom casing 21-Aug 0.5 21-Aug Set water monitor well 24-Aug 0.5 24-Aug <br />Demobe 21-Aug 1.0 22-Aug Demobe 24-Aug 1.0 25-Aug <br />(Site Reclamation 22-Aug 2.0 24-Aug Site Reclamation 25-Aug 2.0 27-Aug <br />Page 1 <br />