My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV12970
DRMS
>
Back File Migration
>
Revision
>
REV12970
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:23:57 AM
Creation date
11/21/2007 10:37:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
8/16/2001
Doc Name
MOUNTAIN COAL CO LLC MCC WEST ELK MINE PN C-80-007 MINOR REVISION 278 SUBMITTAL OF ADEQUACY RESPONSE
From
MOUNTAIN COAL CO LLC
To
MLR
Type & Sequence
MR278
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
\ MOUNTbIN COAL <br />COMPANYI_.~.~. <br />A Subsidiary of Arch Western Resourcts, I1.C <br />West Elk Mine <br />P.O. Box 591 <br />5174 Highway 133 <br />Somerset, CO 81433 <br />(970)929-5015 <br />Fax (970)929-5595 <br />MCC requested authorization from the USFS to construct and conduct exploration drilling operations <br />from AAA and BBB on June 29, 2001. The authorization granted MCC from the USFS on July 6, <br />2001, was for exploration drill pad and hole BBB. The authorization granted also included approval of <br />pad construction and drilling of boreholes from SOM-124, and 96-27-1 (off-set). The USFS has not <br />approved exploration hole AAA. <br />Approval to drill these additional exploration holes, AAA and BBB, is necessary and prudent to <br />characterize and define the boundazies of a methane reservoir thought to exist in the area. MCC is <br />requesting partial approval at this time for BBB and will request approval for AAA when the USFS <br />authorizes that exploration hole. <br />The reclamation plan for these pads and holes will be the same as the reclamation plans submitted in <br />MR-273, MR-275 and MR-277. As the Division requested in the adequacy responses for MR-275, <br />MCC is specifying that the bottom of the hole will be cemented for a minimum of 300' using "tremie" <br />pipe or drill stem. <br />MCC requests the Division's assistance in calculating the bond estimate for these additional pads and <br />drill holes. <br />Please notify me if you have questions regazding our responses to the Division's adequacy questions. <br />Sincerely, <br />enry A. arbe <br />~a ~'~" <br />Enviromnental Engineer <br />Enclosures: Schedule and Completion Diagram for BBB <br />cc: W. Koontz <br />P. Schmidt <br />ComgMR278resp <br />
The URL can be used to link to this page
Your browser does not support the video tag.