My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV12946
DRMS
>
Back File Migration
>
Revision
>
REV12946
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:23:55 AM
Creation date
11/21/2007 10:37:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981039
IBM Index Class Name
Revision
Doc Date
6/26/1990
Doc Name
AGREEMENT BETWEEN COLO MLRD AND ROCKCASTLE CO
Type & Sequence
SF1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Reseed disturbed portions of Pit 4 in accordance with specifications <br />set forth on pages IV-8 to IV-16 of the Reclamation Plan. All reseeding <br />activities under this Agreement shall use Seed Mix N3 -- Primary Reclamation, <br />described on page IV-12 of the Permit. <br />4. Remove the shop building adjacent to Pit 4 and retopsoil and reseed <br />the shop and yard areas. Rockcastle will recontour the shop and yard area fill <br />pad as necessary to achieve approximate original contour criteria of 2 CCR 407-2, <br />Rule 4.14.2 and 1.04(13). <br />* 1 moved from here; text not shown <br />5. Rockcastle shall retain sole discretion over the sequencing of <br />reclamation activities conducted pursuant to this Agreement. <br />6. The reclamation activities specified herein will commence as soon <br />as possible. The reclamation activities specified herein will be completed by <br />November 30, 1990. The date of completion of reclamation shall be extended by <br />mutual agreement of the Division and Rockcastle if the reclamation activities <br />are delayed due to weather conditions or other circumstances beyond the <br />reasonable control of Rockcastle. <br />III. ROADS AND SEDIMENT PONDS -- The Division and Rockcastle agree: <br />1. That the Reclamation Plan contemplates retention of roads and that <br />the surface landowner has requested that these roads remain after site <br />reclamation. Haul roads shall be retained a;~ 4rr~cY='"`"'" ~ '"~ `" `'"""'`" <br />-4 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.