Laserfiche WebLink
<br />4. Proposed revised Map (0, Upper Perched Water Zone, has an incorrect location <br />for the water zone, when compared to the approved Map ]0. Please revise this <br />map. <br />Proposed revised Map 1 1, Lower Perched Water Zone, has an incorrect location <br />for the water zone, when compared to the approved Map 11. Please revise this <br />map. <br />TEXT <br />On proposed revised page 2.03-16, please reword Section 2.03.6(1) to reflect that <br />the Federal lease has been obtained and that the permit area and mineral rights are <br />a combination of private and federal. This text should reflect the situation at the <br />time of the approval of TR-02. <br />7. On proposed revised page 2.04-33, it is stated that the Iron Point Gulch is either an <br />intermittent or a perennial stream. The 1997 Annual Hydrologic Report shows <br />that station D34-12, at the outlet of the Iron Point Gulch, had a flow of .002 cfs on <br />October 31, 1997. If a conclusion can be made using this data and more recently <br />acquired hydrologic data, please update this stream classification. <br />8. On proposed revised pages 2.04-34, 2.04-36, 2.05-67 and 2.05-70, it is stated that <br />all surface water from the mine site is routed through sedimentation ponds. Please <br />revise these pages to state that small area exemptions also treat disturbed area <br />runoff. <br />9. A discussion of the impact of mine water discharge and refuse pile leachate on the <br />North Fork of the Gunnison is presented on proposed revised pages 2.05-74 and <br />2.05-75. Please add a discussion of the impacts to users of the water after it leaves <br />the Bowie No. 2 Mine site but before it reaches the North Fork of the Gunnison. <br />10. On proposed revised page 2.05-84, it is stated that the submittal date for the <br />Annual Hydrologic Report will be on or before May 30 of each year. However, <br />the approved submittal date is March 30, as stated on page 2.05-78 of the permit <br />application. Please justify this change in the submittal date. <br />11. On proposed revised page 2.05-99, it is stated that the results of the subsidence- <br />related hydrologic and visual monitoring will be submitted by the end of each <br />