My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-08-01_REVISION - M1977222
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977222
>
2003-08-01_REVISION - M1977222
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:39 AM
Creation date
11/21/2007 10:37:30 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977222
IBM Index Class Name
Revision
Doc Date
8/1/2003
Doc Name
Financial Warranty Increase
From
Valco - Rocky Ford Div
To
DMG
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 009 <br />Date : 07r2ti/2003 <br />User: JDf <br />State :Colorado PermiUjob# : M--1977-222 <br />County :Otero Abbreviation :none <br />Site :Rocky Ford South Pit Filename :M222-001 <br />Agency or organization name :DMG <br />Permit or other job action :Phased reclama6`on <br />Task description :Grade slopes to 3:1 <br />HOURLY EQUIPMENT COST <br />Cost Breakdown <br />Initial <br />volume : 30,000 <br />Basic machine :Caf D7R Series II - 7SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachmentno.2:NA <br /> Utilization <br />Ownership cosUhour : $34.53 NA <br />OperatingcosUhour: $4370 100 <br />Ripper op. cost/hour : $0.00 NA <br />Operator cosUhour: $24.01 NA <br />Total unitcosUhour: $102.24 TotalfleetcosUhour <br />Swell Loose <br />8CY factor: 1.250 volume <br />Source of estimated volume :calculation <br />Source of estimated swell factor :program <br />Average push distance : 100 feet <br />Unadjusted hourly production ; 714,3 LCY/hr <br />Matedal consistency description <br />Consolidated stockpile <br />Average push gradient <br />Average site attitude <br />Material weight <br />Weight description <br />Decomposed rock - 25% Rock, <br />JOB TIME AND COST <br />15.00 % (r <br />4,350 feet <br />2,650 Ibs/LCY <br />Shift basis : 1 per day <br />Data source : (CRG) <br />$902.24 <br />37,500 LCY <br />Operator skill : 0.75 <br />Material consistency : 1.00 <br />Dozing method : 1.20 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.33 <br />Altitude : 7.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Net correction : 0.69 <br />Adjusted unit production <br />Adjusted fleet production <br />492.22 <br />492.22 <br />Horsepower: 240 <br />Source <br />LCYlhr <br />LCYlhr <br />Fleet size : f Dozers) Total job time : 76.19 Hours <br />Unit cost : $0.208 /LCY Total job cost : $7,789 <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.