Laserfiche WebLink
L <br />10/19/93 12:15p.m. - Flagstaff EAM contacts Susan <br />Burgmaier for map showing soil loss <br />area. CO administrative procedures <br />are also discussed <br />3:OOp.m. - Water samples collected from Pond <br />006 and downdrainage alluvial Well <br />GW-S2W-19A and sent to ACZ and <br />USPCI for TPH analysis <br />5:30p.m. - Flagstaff EAM reviews draft crude <br />oil containment soil remediation <br />plan <br />7:o0p.m. - Flagstaff EAM sends photographs of <br />blast to Mine Superintendent <br />10(20/93 - CDMG (Susan Burgmaier, Larry <br />Routten) and Colorado Oil and Gas <br />Commission (Brian Macke) inspect <br />site <br />• PWCC Sr. Engineer hand delivers <br />plan to clean up spill per <br />Abatement Step No. 1 <br />• Clean up strategy, jurisdiction <br />and regulations discussed <br />• Progress noted in inspection <br />report (including coverage of <br />entire area with peat moss and <br />its effectiveness) <br />- PWCC representatives at spill site <br />inspection were B. Brown, S. <br />Blomberg, C. Belden, 5. Williams, <br />E. Hardy (WESCO), T. Wainwright, <br />C. McCulloh <br />• 10/14/93 blast discussed and <br />explained <br />• Can clean up dike area without <br />formal plan approval <br />10/22/93 - PWCC submitted MR27 addressing <br />Abatement Step No. 2 (revised <br />Blasting Plan to address ground <br />vibration) <br />1OJ25J93 & 10/26/93 - CDMG inspection <br />• C.O. terminated 10/26/93 <br />• Removal of oil dikes noted by <br />inspector, water flowing in 006 <br />Gulch (20-30 gpm estimated) <br />`~y~ ~q.W, _~) dissipated prior to reaching <br />` W Pond 006 <br />~;yy,rU'~ • Slight oil sheen noted on 006 <br />Q Gulch flow <br />