My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-09-18_REVISION - M1977285
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977285
>
2006-09-18_REVISION - M1977285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:25 PM
Creation date
11/21/2007 10:37:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977285
IBM Index Class Name
Revision
Doc Date
9/18/2006
Doc Name
Bond Recalculation
From
DRMS
To
International Uranium (USA) Corp.
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task#: 003 <br />Date : 09/15/2006 <br />User : RCO <br />State : Colorado PermiUjob# : M-1977-285 <br />County : San Miguel Abbreviation :none <br />Site : Sunday Mine Filename :M285-003 <br />Agency or organization name :DRMS <br />Permit or other job action :Final reclamation <br />Task description ;Downhill dozin <br />HOURLY EQUIPMENT COST <br />of waste dump <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $72.92 NA <br /> Operating cosUhour : $98.84 100 <br /> Ripper op. cost/hcur : $0.00 0 <br /> Operator cosUhour : $32.78 NA <br /> Total unit costlhour : $204.53 Total fleet cost/hour : $204.53 <br /> <br />> . <br />MATERIAL QUANTITIES <: > <br />Initial Swell Loose <br />volume : 31,500 CCY factor : 1.335 volume : 42,052 LCY <br /> <br />Source of estimated volume :Updated reclamation map <br />Source of estimated swell factor :n/a <br />HOURLY PRODUCTION ~ Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 120 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 1,093.1 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.52 (Cat HB) <br />Average push gradient : 25.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,800 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.68 <br />Weight description <br />Sandstone Adjusted unit production : 744.56 LCYIhr <br /> Adjusted fleet production : 744.56 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 56.48 Hours <br />Unit cost : $0.275 /LCY Total job cost : $11,552 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.