CIRCES Cost EstimatingSoftware
<br />DEMOLITION WORK
<br />STRUCTURE or ITEM DESCRIPTION DIMENSIONS DEMOLITION MENU SELECTION ~ pDANTITY UNIT UNIT COST TOTAL COST
<br />-WarehousaJxash bay 44x16x12 DemoldispJexisling pd-200'push 4,884.00 CF $0.1295 $632.38
<br />-Auxiliary bldg. 14x20xf0 Dempldisplexisting prt-200'push 2,80000 CF 80.1295 $362.55
<br />-West shop OOx40x15 Demoldisplexisling pd-200'push 24,000.00 CF 80.1295 $3,10].54
<br />-East shop 41x35x15 DemoJduplexisfing pd-200'push 21,525.00 CF $0.1295 $2,78].08
<br />-Attached storage 12x26x10 Demoldisplexisfing pd-200'pvsA 3,120.00 CF $01295 $403.98
<br />-Attached storage 12x12x10 DempJdisplexisfing pd-200'push ;44000 CF $01295 $186.45
<br />-Oftke end tlry bldg. SOx36x15 Demo./displexisfing prt-50'push 2],000.00 CF $0122) $3,3f23H
<br />-Small dems warehouse 28x12xf0 DemoldispJexisting prt-50'push 3,360.00 CF 80.1227 $412.21
<br />-Compressor Dldg. 20x16x12 Demaldisplexisting pd-50'push 3,840.00 CF $01227 $471.09
<br />-Compressor Dldg. 20x40x15 DemoJdispJexisting pd-50'push 12,000.00 CF 80.1227 81,472.17
<br />-Warehouse/wash bay slab 44x16 Demoltlisp. exs. pR, 4'Ih: 200 R. ]04.00 SF $1.1336 $]98.06
<br />-WarehouseN+ash bay eMernal slab 19x19 Demoldisp. exs. pd, 4"th.-20D ft. 361.00 SF $1.1336 $409.23
<br />-AUxdiary bldg. slab 14x20 Demoldisp. ezs. pa, 4"th: 200 R. 28D.OD SF $1.1336 $317.41
<br />-West shop slab 40x40 Demoldisp. exs. pd, 4"!h: 200 ft. 1,600.00 SF 81.1336 81,813.78
<br />-West shop eMernel (W) slab 36x36 Demoldisp. exs. pd, 4'!h: 200 ft. 1,296.00 SF 81.1336 $1,469.16
<br />-West shop srclewalk 4x36 Demo./disp. exs. pd, 4"th: 200 R. 144.00 SF $1.1336 8/63.2d
<br />-West shop exfemal (SJ pad 12x40 Demoldisp. exs. pd, 4" the 200 R. 480 00 SF $1.1336 $544.13
<br />-East shop slab 41x35 Demoldisp-exs. pd, 4"!h: 200 R. 1,435.00 SF $1.1336 $1,626.]3
<br />-Attachetl sfora9e slab 12x26 Demo./tlisp. exs. pd, 4' fh: 200 R. 312.00 SF $1.1336 8353.69
<br />-Attachetl storage slab 12x12 Demoldisp. exs. pd, 4"th.- 200 ft. 144.00 SF $1.1336 8163.24
<br />-East shop a#ernal(W)patl 35x13 Demoldisp. exs. pd, 4'th: 200 ft. 455.00 SF $1.1336 8515.79
<br />-pmts and dry bldg. slab $0x38 Demoltlisp. exs. pd, 4^Ih: SO R. 1,800.00 SF St1214 82,018.4]
<br />-Omce antl dry bldg. sMewalk 90xd Demoldisp. exs. pit, 4'th: 50 R. 360.00 SF $1.1214 $40369
<br />-Small dems warehouse slab 28x12 Demoldisp. exs. pd, 4' fh: 50 R. 336.00 SF 81.1214 8376 ]8
<br />-COmpressror bldg. slab 20x16 Demoldisp. exs. pd, 4' Ri.- 50 ft. 320.00 SF 81.1214 8358 B4
<br />-Compressor bltlg. slab 20x90 Demoltlisp. exs. pd, d"tH: 50 ft. 800.00 SF 81.1214 $897.10
<br />-lUCrownedpowetlines 3800 LF (single poles) Power/phone line-single pole 3,80000 LF $24100 $9,386.00
<br />-Mist parts, debris, scale, /ans, etc 50x60xfOmass Push rubble info pd-to 200 R. 1,111.00 CY $1.029D $1,143.22
<br />-IUCOwned non-PCB trans/ormers 20x20x48 inch Haz waste ~ Drum mat., f-6 dr. 6.00 DRUM $397.5609 $2.385.3]
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />JOB COST Subtotal (ufudfusteo): 838,292 Total Cosl (adjustetl for lowlion): 535,351
<br />
|