Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Agency or organization name :DBMS <br />Task # : 020 State :Colorado PermiUjob # : M-1977-285 <br />Date :09/18/2006 County :San Miguel Abbreviation :none <br />User : RCO Site :Sunday Mine Filename : M285-020 <br />Permit or other job action :Final Reclamation (Tr- <br />Task description :HeUi r@Clamatioll <br />EQUIPMENT TRANSPORT R!G COST <br />Truck tractor description :Generic on-highway fruck <br />Truck trailer description :Generic folding goosenec. <br />Available rig capacities <br />Cost Breakdown <br />ownership cost/hour <br />Operating cosUhour <br />Operator cosUhour <br />HelpercosUhour <br />Total Unit CosUhour <br />to and from site <br />Shift basis : 1 per day <br />Cost data source : CRG Data <br />tor, 6x4, diesel poweretl, 400 HP (2nd half, 2006) <br />op deck equipment trailer (25T, 50T, and 100T) <br />0-25 Tons 26-50 Tons 51+Tons <br />$16.63 $18.37 $22.33 <br />$44.38 $46.13 $50.07 <br />$2766 $27.66 $2766 <br />$0.00 $25.39 $25.39 <br />$88.67 $117.55 $125.45 <br />Machine <br />Description WeighUunit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />CosUhr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />CosUhr/fleet DOT permit <br />Cost/fleet <br />-Cat D6R LGP - 6S (2003) 28.39 $28.55 $117.55 1 $146.70 $11755 $0.00 <br />-Caf D9R - 9SU (2005) 66.73 $64.72 $125.45 1 $190.17 $125.45 $0.00 <br />-CAT 950G high lift (2002) 21.14 $21.50 $88.67 1 $110.77 $88.67 $0.00 <br />-Cat 730 24.80 $34.89 $88.67 3 $370.69 $266.01 $0.00 <br />-Reveg equipmt 10.00 $10.00 $88.67 1 $98.67 $88.67 $0.00 <br />-CAT 908 6.66 $9.09 $88.67 1 $97.77 $88.67 $0.00 <br />sheet 1 of 2 <br />Subtotals <br />