Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />Agency or organization name :ORMS <br />Task # : 012 State :Colorado Permit/job # : M-1977-285 <br />Date : 09/18/2006 County :San Miguel Abbreviation :none <br />User : RCO Site :Sunday Mine Filename : M285-012 <br />Permit or other job action :Final reclamation (TR-02 updated) <br />Task description :Haul backF!! material for placement into ventshafr S-8 <br />HOURLY EQUIPMENT COST <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-W ater truck <br />Cost Breakdown : Truck/Load <br />Truck er Work Team <br />Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loatler NA NA NA NA <br />Utilization-machine : 100 91 NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownership cost/hour : $34.89 $21.50 NA NA NA NA <br />Operating cosf/hour: $47.67 $26.54 NA NA NA NA <br />Ripper op. cosUhour: NA NA NA NA NA NA <br />Operator cost hour: $21.75 $32.78 NA NA NA NA <br />Unit subtotals: $104.25 $80.83 NA NA NA NA <br />Number of units : 3 1 0 0 0 0 <br />Group Subtotals: Work: $393.58 Support: $0.00 Maintenance; $0.00 <br />Total work team cost/hour : $393.58 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 1,069 LCY factor: NA volume: 1,069 LCY <br />Source of quantity take-off : TR-02 reclamation plan <br />Source of estimated swell factor : NA <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />Truck Caoaciw <br />Truck Payload i <br />Descr. <br />Shift basis : 1 per day <br />Truck Bed (volume) Basis <br />Material weight : 2,550 pounds/LCY Struck volume <br />(stone Heaped volume <br />Rated payload : 80,000 pounds Average volume <br />Payload capacity : 23.53 LCY Adjusted volume': <br /> Final truck volume based on number of loader passes <br /> 'truck volume atl~ustetl to not exceed 21etl payloatl or heapetl v°lume <br />Loading Tool Capacity <br />Rated capacity (nom. heaped) : 3.750 LCY <br />Descr.: Blasted rock -avg. blasted (75 - 90%) <br />Altitude <br />Truck <br />16.40 LG7 <br />21.40 LCY <br />18.90 LCY <br />21.40 LCY <br />18.56 LCY <br />Site altitude (ft.) : 5,900 <br />Loader ~ Source <br />1.000 (Cat HB <br />0.830 (1 shiff/da; <br />0.830 <br />Bucket fill factor : 0.825 Job efficiency : 0.830 <br />Adjusted bucket capacity : 3.094 LCY Net correction : 0.830 <br />Truck loader team -Truck :Cat 730 <br />-Loader :CAT 950G high lift (2002) <br />