My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-09-18_REVISION - M1977285
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977285
>
2006-09-18_REVISION - M1977285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:25 PM
Creation date
11/21/2007 10:37:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977285
IBM Index Class Name
Revision
Doc Date
9/18/2006
Doc Name
Bond Recalculation
From
DRMS
To
International Uranium (USA) Corp.
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />Task # <br />Date <br />User: <br />Agency or organization name : DRMS <br />009 State :Colorado PermiUjob # : M-1977-285 <br />09/18/2006 County :San Miguel Abbreviation :none <br />RCO Site :Sunday Mine Filename : M285-009 <br />Permit or other job action :Final reclamation (TR-02 updated) <br />Task description :Haul backfill material for placement into vent shaft S-4 <br />HOURLY EQUIPMENT COST <br />Truck/loader team -Truck : Cat 730 <br />-Loader : CAT 950G <br />Support equipment -Load area : NA <br />-Dump area : NA <br />Road maintenance -Motor grader : NA <br />-W ater truck : NA <br />lift <br />Shift basis : 1 per day <br />Cost Breakdown : TrucWLoad <br />Truck er Work Team <br />Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA NA NA NA <br />Utilization-machine : 100 97 NA NA NA NA <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownership cost/hour: $34.89 $21.50 NA NA NA NA <br />Operating cost hour: $47.61 $28.38 NA NA NA NA <br />Ripper op. cosUhour : NA NA NA NA NA NA <br />Operator cost/hour : $21.75 $32.78 NA NA NA NA <br />Unit subtotals : $104.25 $82.66 NA NA NA NA <br />Number of units : 3 1 0 0 0 0 <br />Group subtotals : Work : $395.42 Support: $0.00 Maintenance : $0.00 <br />Total work team cosUhour : $395.42 <br />MATERIALQUANTITIES <br />Initial Swell Loose <br />volume: 1,069 LCY factor: NA volume: 1,069 LCY <br />Rated payload : 60,000 pounds Average volume : Y8.90 LCY <br />Payload capacity : 23.53 LCY Adjusted volume': 21.40 LCY <br />Final truck volume based on number of loader passes : 18.56 LCY <br />'truck volume atl~ustetl to not ezceed ratetl payload or heaped volume <br />Loading Tool Caoaciri <br />Rated capacity (nom. heaped) : 3.750 <br />Descr.:Blasted rock-avg. blasted (75 <br />Bucket fill factor : 0.825 <br />Adjusted bucket capacity : 3.094 <br /> Job Condition Corrections : Site altitude (tt.) : 6,000 <br />LCY Truck Loader Source <br />0%) Altitude adj.: 1.000 1.000 (Cat HE <br /> Job effciency : 0.830 0.830 (user) <br />LCY Net correction : 0.830 0.830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.