My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-09-18_REVISION - M1977285
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977285
>
2006-09-18_REVISION - M1977285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:25 PM
Creation date
11/21/2007 10:37:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977285
IBM Index Class Name
Revision
Doc Date
9/18/2006
Doc Name
Bond Recalculation
From
DRMS
To
International Uranium (USA) Corp.
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br /> CIRCES Cost Estimatino Software <br /> TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name :DBMS <br />Task # : 007 State :Colorado PermiUjob # : M-1977-285 <br />Date : 09/18/2006 County :San Miguel Abbreviation :none <br />User : RCO Site :Sunday Mine Filename : M285-007 <br />Permit or other job action :Final reclamation (TR-02 updated) <br />Task description :Haul hack//material for placement into vent shaft S-2 <br />HOURLY EQUIPMENT COST <br />Shin basis : 1 per day <br />Trucklloader team -Truck <br />-Loader <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br />Cost Breakdown : Truck/Load <br />Truck er Work Team <br />Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data flename : truck2 loader NA NA NA NA <br />Utilization-machine : 100 71 NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownership cast hour: $34.89 $21.50 NA NA NA NA <br />Operating cost/hour: $47.61 $2D.68 NA NA NA NA <br />Ripper ap. cosUhour : NA NA NA NA NA NA <br />Operator cosllhour : $21.75 $32.78 NA NA NA NA <br />Unit subtotals: $104.25 $74.97 NA NA NA NA <br />Number of units : 1 1 0 0 0 0 <br />Group subtotals : Work : $179.22 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $179.22 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 1,069 LCY factor : NA volume : 1,069 LCY <br />Material weight : 2,550 pounds/LCY Struck volume : 16.40 LCY <br />Descr.:Sandstone Heaped volume : 21.40 LCY <br />Rated payload : 60,000 pounds Average volume : 18.90 LCY <br />Payload capacity : 23.53 LCY Adjusted volume`: 21.40 LCY <br /> Final truck volume based on number of loader passes : 18.56 LCY <br /> 'truck volume atljuste0 to not exce etl ratetl payload or heaped volume <br />Loading Tool Capacity : Job Condition Corrections : Site altitude (ft.) : 6,000 <br />Rated capacity (nom. heaped) : 3.750 LCY Truck Loader Source <br />Descr.: B/acted rock -avg. b/acted (75 - 90%J Altitude atlj.: 1.000 1.000 (Cat HE <br />Bucket fll factor : 0.825 Job effciency : 0.830 0.830 (1 shift/d< <br />Adjusted bucket capacity : 3.094 LCY Net correction : 0.830 0.830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.