Laserfiche WebLink
<br /> <br />r <br />-3- <br />SCHEDULE TO NOTICE OF VIOLATION <br />Notice of Violation No. NOV C-84-139 <br />NATURE OF VIOLATION: <br />Failure to certify the construction of the haul road. <br />ACT, REGULATION, OR PERMIT PROVISION(S) VIOLATED: <br />ACT SECTION(S) <br />REGULATION SECTION(S) 4.03.1(d) <br />PERMIT SECTION(S) <br />PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br />The haul road at the load-out that leads to the truck dump. <br />STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION): <br />Submit a letter from a qualified registered professional engineer that <br />certifies the haul road was built in accordance with the approved designs. <br />TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS): <br />ON OR BEFORE August 3 19~ <br />(Rev. 6/84) <br />Doc. No. 221 <br />