Laserfiche WebLink
• • III IIIIIIIIIIIIIIII~ <br />STATE OF COLORADO <br />Roy Romer, Gove <br />DEPARTMENT OFNATURALRESOURCES <br />MINED LAND RECLAMATION DIVISION <br />FRED R. BANTA, Director <br />DATE: May 4, 1988 <br />T0: Peter O'Connor <br />FROM: Susan Mowry o`~~ <br />RE: APEX N0. 2 MINE BOND REVIEW <br />Pursuant to our meeting on May 3, 1988 with Mr. Dave Canning at the Apex hlo. 2 <br />Mine, I have determined that my bond calculations should be adjusted <br />slightly. The adjustments are as follows: <br />(1) The portal bench is partially backfilled. I estimated, and h1r. Canning <br />concurred, that approximately half of the necessary backfill exists on <br />the bench. Therefore, my previous estimate of $925 to haul and place <br />hackfill should he reduced by half. <br />(2) The coal bins are 25 feet high, not 45 feet as previously stated. <br />Therefore, $2,499.00 should he subtracted from structural demolition <br />costs. <br />(3) Mr. Canning is planning to submit a letter from the landowner requesting <br />that the bathhouse remain. Upon submittal of the letter an additional <br />$4,781.00 could be deleted from structural demolition costs. <br />Based on these three adjustments, my previous bond estimate of $90,554.00 <br />should he reduced by $7,74?.. 00, resulting in a required bond amount of <br />E82,812.00. <br />old. ~0 ~ <br />~~ ~,o•o~ <br />hm <br />7134E <br />~~Mn.D'~WNN2 It ii2;>? M-tio ZrT9,tuSrE~'~ 1~-~~~i~,J ~F ShCP = <br />~3~j.l.OJ ypv~NroS F2r7M ~ ST'.tf G~(I.fIP.tL 17dU4C,r Tt.~.,) c_-`stl^^.o~7•~~ <br />~A(o i 1. <br />1-V ~ <br />215 Centennial BulldlnQ, 1313 Sherman Street Denver, Colorado 80203.2273 Tel. (303) 886.3567 <br />