My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE24068
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE24068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:02 PM
Creation date
11/21/2007 10:36:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Enforcement
Doc Date
6/23/1986
Doc Name
PROPOSED SETTLEMENT AGREEMENT FOR NOTICE OF VIOLATION C-86-033 TRAPPER MINE
From
MLRD
To
TRAPPER MINING INC
Violation No.
CV1986033
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />DEPARTMENT OF NATURAL RESOURCES <br />Davitl H. Getches. Executive Director <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON, Director <br />Ricnartl D. Lamm <br />Governor <br />SETTLEMENT AGREEMENT <br />Cessation Order No. <br />Notice of Violation No. C-86-033 <br />Mine Name: Traooer Mine Permit No.: C-81-010 <br />Permittee: Trapper Mininfl inc_ <br />Mailing Address: P.O. Box 187, Craig, Colorado 81627 <br />Operator <br />(If Other than Permittee): <br />Mailing Address: <br />County: Moffat Type of Mine: Surface, federal <br />The Mined Land Reclamation Division ("the Division") issued a certain Notice <br />of Proposed Amount of Civil Penalty, and the operator requested a conference <br />thereon, as authorized by C.R.S. 1973, 34-33-123(8). The requested conference <br />having been held as required by law, the Division and the operator hereby <br />agree as follows: <br />1. The amount of the penalty shall be $ 500.00 ; <br />2. The penalty shall be paid to the Division by the operator not later <br />than 30 days from the date hereof; <br />3. Payment of such penalty by the operator shall constitute a waiver <br />of all further rights to review of such penalty or of the violation <br />on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten <br />days after the closing date of such conference, which date is set forth below <br />opposite the signature of the Conference Officer. If not so signed, the <br />Division will fix the penalty at whatever amount it deems appropriate, based <br />upon the factors referred to in C.R.S. 1973, 34-33-123(8)(d). <br />DATE: <br />OPERATOR <br />By <br />DATE: ~,~~ .2~ I "5 ;, <br />C.R.S. 34-33-123(8)(c)(d) <br />DIVISION OF MINED LAND RECLAMATION <br />Confer nce Officer <br />// i <br />Concur In: ~ -., <br />Division Director <br />(Rev. 5/85) <br />Doc. No. 5016 <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.