My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV12782
DRMS
>
Back File Migration
>
Revision
>
REV12782
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:23:45 AM
Creation date
11/21/2007 10:36:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Revision
Doc Date
7/30/1993
Doc Name
BEAR COAL CO INC SEDIMENT POND DESIGN TR 15 PN C-81-033
From
J E STOVER & ASSOCIATES
To
DMG
Type & Sequence
TR15
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER & ASSOCIATES III IIIIIIIIIIIIIIII <br />2768 COMPASS DRIVE, SUITE 101 999 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (303) 245-4101, FAR 242-7908 <br />MINE ENGINEERING CIVIL ENGINEERING <br />MINE RECLAMATION CONSTRUCTION MANAGEMENT <br />PEN.,• <br />July 28, 1993 <br />i IF ~~~~,`: L ^~e <br />s. s. shuey JUL 3 6 1993 <br />1313sShermanMSteraRoomn215eology ~ivisnn(l,'y'"'n'U,yuVCJ",r <br />Denver, CO 80203 <br />Re: Bear Coal Company, Inc. <br />Sediment Pond Design - TR-015 <br />Permit C-81-033 <br />Dear Mr. Shuey: <br />The Division's letter dated July 19, 1993 transmitted its adequacy <br />comments for the referenced technical revision application. <br />Following are Bear's responses to the Division's adequacy issues: <br />1. Drawing 11-3 was revised to illustrate the gate valve and <br />the fact that the valve is normally closed to provide for <br />the full water level. <br />2. Drawing 11-3 was revised to show the slope of the primary <br />spillway and the slopes of the pond embankment. <br />3. - 4. New pages 11-12 and 11-13 are provided to discuss <br />sediment pond operations. Sediment pond dewatering and <br />sediment removal from the pond are discussed and <br />explained. The "gap" in the stage filling diagram is <br />also discussed on these new pages. <br />Please call if you have any questions. <br />Sincerely, <br />uw.l. <br />Jim Stover, P.E. <br />Consulting Engineer <br />Enclosures <br />cc: W. A. Bear, Jr. <br />
The URL can be used to link to this page
Your browser does not support the video tag.