Laserfiche WebLink
Matthew S. Hayes <br />June 28, 1989 <br />Page 9 <br />Once drilling activities have been completed, reclamation will begin. All <br />trash, debris, equipment, and unused material will be removed from the <br />site and adjacent azea. <br />Reclamation of the drilling operation will include baclcfilling of pits, <br />regrading where necessary, redistribution of topsoil where applicable, <br />reconstruction of water bars, seeding and in critical azeas, mulching with <br />straw. Seed tnix will be WECC permanent mix as approved by CMLRD in <br />the Mt. Gunnison Mining and Reclamation Plan. The seed mix can be <br />found in Volume 1, Section 4, Page 4-15 of the M & R Plan. Seed will <br />be broadcast at the rate of 35 lbs. 90% PLS per acre. Regraded areas <br />will approximate pre-existing contours as much as is practical. <br />Bond for this drill hole has been estimated as follows: <br />Baclcfilling and Grading -Pit $ 250.00 <br />- Roads $ 250.00 <br />Seed and Mulch <br />Total Cost <br />WECC Bond Summary - <br />$ 875.00 <br />WECC Bond Amount 52,250,000.00 <br />Current WECC Bond Required $2,063,429.00 <br />Drilling Bond 1989 $ 875.00 <br />New Bond Needed $2,064,304.00 <br />Actual Bond Amount $2,250,000.00 <br />New Surplus <br />- Seed $ 100.00 <br />- Mulch $ 25.00 <br />- Labor $ 150.00 <br />- Vehicle $ 100.00 <br />$ 185,696.00 <br />No change in the WECC bond rider is required. <br />