My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV12765
DRMS
>
Back File Migration
>
Revision
>
REV12765
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:23:44 AM
Creation date
11/21/2007 10:36:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977297
IBM Index Class Name
Revision
Doc Date
8/2/2001
Doc Name
REQUEST FOR TR COMPLIANCE WITH RULE 4.2.1 8 BURROS MINE PN M-77-297
From
GOLD EAGLE MINING INC
To
DMG
Type & Sequence
TR4
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Urnnium Lease Management Program <br />Attachment 2 <br />C-JD-S Reclamation Bond Requirement/Recalculation <br />The C-JD-S Mine site contains one large building (hoist/compressor house), the main shaft and <br />two ventilation shafts, three mine-waste-rock dumps, two low-grade-ore stockpiles, 3n electrical <br />substation and distribution line, a septic system, and miscellaneous mine-related trash/debris. <br />Accordingly, the reclamation performance bond requirement is recalculated in accordance with <br />GJO's current reclamation standards/practices as follows: <br />Structures Demolition <br />Hoist/Compressor House -salvaged by outside subcontractor for no cost to GJO <br />Mine Headframe -left in place for its historic value <br />Portal Closures (main shaft and two vents) <br />Big Loader $3,060 per week 2 days $1,530 <br />Pickup (4X4) $605 per week 1 day $]52 <br />Trailer $309 per week 1 day $78 <br />Torch Kit $312 per week 1 day $78 <br />Crew $1,477 per week 4 man days $1,477 <br />Concrete $150 per cubic yard 14 cubic yards $2,100 <br />Polyurethane Foam $350 per cubic yard 14 cubic yards $4.900 <br /> Subtotal $10,315 <br />Materials Recontouring (Mine-waste-rock and low-grade ores) <br />Trackhoe (large) $1,968 per week I week $1,968 <br />Dozer (2 large) $4,661 per week 2 weeks $9,322 <br />Crew $1,477 per week 3 man weeks $4 431 <br />Subtotal $15,721 <br />Miscellaneous <br />Electrical substation (utility owned - to be dismantled) $600 <br />Utility distribution lines (removal of 5 poles) $2,500 <br />Septic system (permanent closure of removal) $500 <br />Trash/Debris cleanup 300 <br />Subtotal $3,900 <br />Revegetation (4.0 acres @ $1,700 per acre) $6.800 <br />Subtotal $6 800 <br />TOTAL $3G,73G <br />G?LONPn5SC0'ITERVILMNRECLAIM'CEM1~00ND~REQ.105 <br />
The URL can be used to link to this page
Your browser does not support the video tag.