Laserfiche WebLink
<br /> <br />Urnnium Lease Management Program <br />Attachment 2 <br />C-JD-S Reclamation Bond Requirement/Recalculation <br />The C-JD-S Mine site contains one large building (hoist/compressor house), the main shaft and <br />two ventilation shafts, three mine-waste-rock dumps, two low-grade-ore stockpiles, 3n electrical <br />substation and distribution line, a septic system, and miscellaneous mine-related trash/debris. <br />Accordingly, the reclamation performance bond requirement is recalculated in accordance with <br />GJO's current reclamation standards/practices as follows: <br />Structures Demolition <br />Hoist/Compressor House -salvaged by outside subcontractor for no cost to GJO <br />Mine Headframe -left in place for its historic value <br />Portal Closures (main shaft and two vents) <br />Big Loader $3,060 per week 2 days $1,530 <br />Pickup (4X4) $605 per week 1 day $]52 <br />Trailer $309 per week 1 day $78 <br />Torch Kit $312 per week 1 day $78 <br />Crew $1,477 per week 4 man days $1,477 <br />Concrete $150 per cubic yard 14 cubic yards $2,100 <br />Polyurethane Foam $350 per cubic yard 14 cubic yards $4.900 <br /> Subtotal $10,315 <br />Materials Recontouring (Mine-waste-rock and low-grade ores) <br />Trackhoe (large) $1,968 per week I week $1,968 <br />Dozer (2 large) $4,661 per week 2 weeks $9,322 <br />Crew $1,477 per week 3 man weeks $4 431 <br />Subtotal $15,721 <br />Miscellaneous <br />Electrical substation (utility owned - to be dismantled) $600 <br />Utility distribution lines (removal of 5 poles) $2,500 <br />Septic system (permanent closure of removal) $500 <br />Trash/Debris cleanup 300 <br />Subtotal $3,900 <br />Revegetation (4.0 acres @ $1,700 per acre) $6.800 <br />Subtotal $6 800 <br />TOTAL $3G,73G <br />G?LONPn5SC0'ITERVILMNRECLAIM'CEM1~00ND~REQ.105 <br />