My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE24045
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE24045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:02 PM
Creation date
11/21/2007 10:36:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Enforcement
Doc Name
TERMINATION NOTICE FOR NOV OR CESSATION ORDER
Violation No.
CV1989018
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />MINED LAND RECLAMATION DIVISION <br />STATE OF COLORADO, DEPARTMENT OF NATURAL RESOURCES <br />NOTICE OF VIOLATION NOV No. <br />Permit No. ~~ ~; ~ - ( ~';K Mine: ,z'i ,~: ,; f~ r _ _ <br />Type of Mine: il~ri.. u~,r,:,.,;i~==„~ .~ ~~r_ County. ~.~ ~.. -..; <br />Operator (If Other than Permittee): Permittee: ~.r,~.,~f' )r. ~~r<i"~-r;,,` <br />°~i ,~, 6 Mai 1 Address : p , , ,:; •.r r l ~ ; "r <br />Mail Address: ~?/~, ;=gin ; c `r `1 ~ .; r~~Jr ,~ r r,~c; r r 4 2 ', <br />r <br />~<rc,,,lr,~ ~~~,, ;, ,_,,~ Date/Time of Inspection: <br />Inspector ~ , '•; ~ . ~J~. - <br />Person Served: <br />Signature o person served <br />A - / ; <br />Served By: <br />S,ig"nature of authorj'zed representative <br />of Mined Land Reclamation Division) <br />ease print name and title <br />CERTIFIED MAIL N0. 3~ ~ n n~ <br />Return Receipt Requeste <br />Date and Time of Service: <br />A.M. <br />P.M. <br />The Mined Land Reclamation Division ("the Division") has conducted an inspection of <br />the above mine and has made the findings stated in the attached schedule and has <br />found violations of the Colorado Surface Coal Mining Reclamation Act, or violations <br />of required permit conditions, listed in the attached schedule. This notice <br />constitutes a separate notice of violation for each violation listed. <br />You must abate each of these violations within the designated abatement time. <br />Where the remedial action requires submission of plans, the plans are to be <br />submitted to the Division within the designated time. You are responsible for <br />doing all work in a safe manner in compliance with all applicable laws and <br />regulations. <br />The undersigned finds that cessation of mining is is not ,~ expressly, or in <br />practical effect, required by this notice. for this purpose,-mining" means <br />extracting coal from the earth or from a waste pile and transporting it within or <br />from the mine site. <br />C.R.S. 1973, 34-33-123(8) provides for imposition of civil penalties of up to <br />b5,000 for each violation and provides that each day of continuing violation may be <br />deemed a separate violation. <br />Important: Please read the reverse side of this page. <br />
The URL can be used to link to this page
Your browser does not support the video tag.