Laserfiche WebLink
I' ~ ~ <br />Fugitive dust is expected from only one source--truck <br />1 traffic along the haul roads. Experience indicates the mining <br />' operations in the pits generate little dust, if any. Water <br />will be sprayed onto the roads to control dust. <br />Mining Timetable. The uncertainty of current economic <br />conditions in the construction industry precludes accurate <br />' forecasts of mining activity over the life of the mine. <br />Therefore, the operator has elected to estimate a mining <br />1 timetable based on an average year and expects a specific <br />' year to vary widely from the average. <br />Stage Years Total Acres +/- Mines Acres +/- <br />' 1 10-20 63.13 32.55 <br />2 20-30 58.40 54.23 <br />1 3 10-20 44.38 35.96 <br />' TOTALS 165.91 122.74 <br />1 <br />~1 <br />~1 <br />1 <br />1 <br />1 11 <br />