My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE24023
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE24023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:33:01 PM
Creation date
11/21/2007 10:35:41 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
4/21/1992
Doc Name
MONITORING BATTLE MTN GOLD SAN LUIS PROJECT FN M-88-112
From
MLRD
To
MICHAEL LONG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:=~ ~ ~IIIIIIIIIIIIIIIIIII <br />• <br />- STATE OF COLORADO <br />MINED LAND RECLAMATION DIVISION pF'CO~ <br />~F~' 'P <br />Department of Natural Resources r.--g1~,l~-To <br />1313 Sherman SL. Room 215 ~I ~ ~ o <br />Denver. CO 80203 ~`1 ~ ~~ <br />•~,_~~- <br />303 8663567 re 76' <br />FA X: 303 832-8106 <br />Roy Romer, <br />Governor <br />Michael8 Lang. <br />Divi5i0n Director <br />DATE: April 21, 1992 <br />T0: Michael Long <br />FROM: Larry Oehler ~~~ <br />RE: Monitoring - Battle Mountain Gold (BMG), San Luis Project, <br />File No. M-88-112 <br />I have researched the San Luis Project file thoroughly to determine BMG's <br />monitoring requirements and history of reporting results to the Divlision. <br />Because the present Notice of Possible Violation is related to mill and <br />tailings facility operations, I limited the search to monitoring anld reporting <br />required since start up of the mill which was in January of 1991. <br />On December 20, 1990, Battle Mountain Gold submitted to the Division a request <br />for a technical revision to revise the monitoring Schedule and monitoring <br />parameters. The review process for that technical revision was note completed <br />by the Division and it became a revision to the permit automaticall on <br />January 20, 1990. I have attached copies of the approved permit and technical <br />revision schedules and parameters. The technical revision changed ithe surface <br />and ground water sampling schedule from monthly (May-June) and quarterly <br />(October, January, April and July) to a quarterly schedule. New analytical <br />parameters were added to two quarterly monitoring periods. The revised <br />sampling during the remaining two quarters includes a reduced suit of <br />parameters which eliminated sampling in these quarters for total cyanide. <br />A document titled Monitoring Requirement Summary submitted to the givision <br />January 22, 1990 states that "chemical analysis of the collection pond seepage <br />on a quarterly basis for the parameters identified in Table G 1-2 f the <br />approved permit will be performed. In addition, the leak detection system of <br />the collection pond will be monitored for any water weekly during initial six <br />month start-up and monthly thereafter." There is no commitment tq report <br />this data to the Division. Also, this document states that "data ~ollected as <br />part of the tailings monitoring program will be compiled into an a nual report <br />for submittal to the MLRD." <br />Battle Mountain Gold stated in their permit and adequacy responses that they <br />would also monitor settlement of the tailings embankment free water' pool <br />volumes, deposited tailings densities, and the quantity and quality{ of <br />solution draining to the collection pond from the tailings disposal facility. <br />However, I did not find a commitment by BMG to submit these monitoring results <br />to the Division. <br />
The URL can be used to link to this page
Your browser does not support the video tag.