Laserfiche WebLink
,, iiiiiiiiiiiiiiiiiii <br />EXHIBIT E <br />RECLAMATION PLAN <br />After the gravel is removed from the total pit area, the side will be sloped to no <br />steeper than 3:1. Stockpiled topsoil will be placed over the slopes to a depth of 6" - IZ" and <br />-~ to the exten~t`~v_ailable stockpiled topsoil. Stabilizing with revegetation will be as <br />recommended by the Soil Conservation Service (See Exhibit J). The bottom of the pit will <br />be sloped to provide adequate drainage. <br />