My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE23958
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE23958
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:32:59 PM
Creation date
11/21/2007 10:34:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981011
IBM Index Class Name
Enforcement
Doc Date
3/11/1990
Doc Name
EXTENSION OF ABATEMENT BEYOND 90 DAYS NOV C-89-03 SUNLAND MINING CORP APEX 2 C-81-011
From
MLRD
To
FRED BANTA-MIKE LONG-JIM STEVENS
Violation No.
CV1989031
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />1313 Sherman St., Room 2l5 <br />Denver, CO 60203 <br />303 666-3567 <br />FA K: 303 632-6106 <br />DATE: March 11, 1990 <br />T0: Fred Banta <br />Mike Long <br />Jim Stevens <br />FROM: David Berry <br />RE: Extension of Abatement Beyond 90 Days <br />Notice of Violation C-89-031 <br />Sunland Mining Corporation <br />Apex No. 2 <br />C-81-011 <br />• III IIIIIIIIIIIII III <br />STATE OF COLORADO <br />of ~~~ <br />'v 9 <br />e~ti90 <br />„r', ~ ~ O <br />it Ro +, <br />~ r876 ~ <br />Roy Romer. <br />Govemw <br />Fred R. Banta. <br />Division Director <br />Based on my inspection of November 11, 1989, Notice of Violation C-89-031 was <br />issued for failure to maintain the drainage control system in accordance with <br />the approved plan. Abatement No. 1 required the operator to "maintain the <br />entire drainage control system so that all ditches and culverts are clear of <br />debris, and so that all ditches are in compliance with the dimensional <br />requirements specified on Plate ]" of the permit document. This was to be <br />completed by December 1, 1989. <br />Much of the maintenance had been completed as of a November 27, 1989 <br />inspection; however, some work remained outstanding due to winter weather and <br />around conditions. The Division Director issued an abatement extension to <br />March 1, 1990 as allowed under the provisions of Rule 5.03.2(2)(c). <br />During the week of February 26 - March 2, 1990, but prior to March 1, 1990, <br />h1r. David Canning called to request a further extension due to deep snow cover <br />over the site. A formal written extension re guest, dated February 28, 1990, <br />was received on March 5, 1990. <br />A brief inspection of the area on March 8, 1990 verified that the around is <br />indeed buried under 2-3 feet of snow. The operator has requested an extension <br />to April 30, 1990. <br />I hereby request the concurrence of the Administrator, in accordance with Rule <br />5.03.2(2)(e), regarding the requested extension to April 30, T990. I feel <br />that this is the shortest possible time required to complete the abatement, <br />and that sufficient interim measures have been completed to minimize harm to <br />the Dublic or to the environment. <br />DAB/yjb <br />5080E <br />
The URL can be used to link to this page
Your browser does not support the video tag.