Laserfiche WebLink
.. ~ •- <br />-6- <br /> Location in A lication <br /> INFORMATION CATEGORY NARRATI VE MAPS <br />2.05.3(7) Coal Handling Structures N/A <br />2.05.3(8) Coal Processing Waste and vol. 7, iA6 12 <br /> Non-Coal Processing Waste Page 12-55 <br />2.05.3(9) Underground Development A/A <br /> Waste <br />2.05.3(10) Return of Coal Processing <br /> Waste to Abandoned N/A <br /> Workings <br />2.05.4 Reclamation Plan vol. 9, TAB 13 <br />2.05.4(2)(a) Timetables uol. 9, TAB 13 <br /> - Page 13-38 <br />2.05.4(2)(b) Reclamation Cost Estimates vol. 9, rA6 13 <br /> Page 13-53 <br />2.05.4(2)(c) Backfilling and Grading *Post-mining <br /> . vol. 7, me 1z topography - <br /> Page 12-56 2.05.4(2)(c) <br />2.05.4(2)(d) Topsoil (Redistribution) vol. 9, iA8 13 <br /> Page 13-13 <br />2.05.4(2)(e) Revegetation vol. 9, rA6 13 <br /> Page 13-18 <br />2.05.4(2)(f) Disposal of Debris, Acid- - <br /> Forming and Toxic-Forming vol. 7, TAB 12 <br /> Mdte ridl5 _ _ Page 12-58 <br />2.05.4(2)(8) Sealing or Managing Mine <br /> Openings, Exploration vol. 7, rA6 12 <br /> Ho1es,.Other Boreholes or page 12-60 <br />- Wells <br />2.05.5 Post-mining Land Uses *Post-mining land <br /> <br />2.05.5(1)(c) Vol. <br />Page 9, TAB <br />13-6 13 <br />ore(2)!c) <br /> <br />2.05.6 Mitigation of the Impacts Vol. 9, iAB 14 <br /> of Mining Operations Page 14-1 <br />2.05.6(1) Air Pollution Control Plan Vol. 9, iAB 14 <br /> Page 14-2 <br />