My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV12605
DRMS
>
Back File Migration
>
Revision
>
REV12605
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:23:35 AM
Creation date
11/21/2007 10:34:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
7/16/2007
Doc Name
Letter & Application
From
Twentymile Coal Company
To
DRMS
Type & Sequence
MR219
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peabody <br />Twentymile Coal Company <br />,~ <br />29515 Routt County Road #27 <br />Oak Creek, CO 80467 <br />970.879.3600 <br />July 9, 2007 <br />Mr. Byron Walker <br />Environmental Protection Specialist <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />(303)866-4941 <br />RECEIVED <br />~u~ ~ s 2ao~ <br />Division of [reclamation, <br />Mining and Safety <br />Re: Twentymile Coal Company - Foidel Creek Mine (Permit No. C-82-056), Minor Revision (MR07- <br />219) -Temporary Office Trailer <br />Dear Mr. Walker: <br />Twentymile Coa] Company (TCC) requests CDRMS approval of a Minor Revision to our approved Permit <br />for installation, operation, maintenance, and removal of a temporary ofTce trailer. The temporary trailer is <br />needed to provide additional office space for mine staff, and will be set-up behind the existing Mine <br />Office/Bathhouse Building. The temporary office trailer will be installed in a previously disturbed area, will <br />result in no new surface disturbance, and will not affect existing drainage and sediment control structures. <br />As a modulaz unit, the temporary trailer will require no additional utilities beyond a drop power connection <br />from the existing Bathhouse, and can be removed at any time <br />At such time as the temporary office trailer is no longer needed to support ongoing or future mining and <br />related operations, it will be removed from the site, and the associated disturbance areas reclaimed as part of <br />final reclamation for the 6MN Shaft installation. <br />This submittal includes revised PAP text and maps addressing the location, configuration, operation, <br />maintenance, and removal of the temporary office trailer. New and revised PAP materials aze identified by <br />the attached Summary of Revisions/Additions. TCC would like to proceed with this project as soon as <br />possible, so that construction can be completed under favorable weather and ground conditions. After you <br />have opportunity to review the accompanying information, please feel free to contact me with any questions <br />or to discuss submittal materials or related matters. <br />Best regards, <br />Twentymil ompany <br />Jerry M. eton <br />Enviro a al Manager <br />cc: Mike Berdine/TCC <br />G:\Environmental\REVISION\MINOR-RV\MR07-219 Additional Office Trailer\MR07-219 Office Trailer Transmittal <br />Ltr.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.