Laserfiche WebLink
MOUNT ROYALE VENTURES, LLC v~ <br />Post Onke Box 7875 <br />Boulder, Colorado 80308 <br />(~1588.tibr8 <br />March 23, 2005 <br />Ms. Kate Pickford <br />Environmental Protection Specialist <br />Division of Minerals and Geology <br />1313 Sherman Street -Room 215 <br />Denver, Colorado 80203 <br />RE: Technical Revision No. OB <br />Gold Hil~ill (NERD Permit No. M-947) <br />Dear Ms. Pickford: <br />'jT2-fa/ <br />RECEIVED <br />MAR 2 32005 `~ <br />Dlsirion ~f Miaerats and Geology <br />Mount Royale Ventures, LLC ("MRV') proposes the following minor modifications to <br />facilities that may have a material effect on the existing Gold Hill Mill Permit No. M-g4- <br />117. Through this transmittal, MRV is requesting MLRD review and issuance of an <br />authorization to proceed with the implementation of the following indicated actions, <br />subject to MLRD concurrence and MRV coMormance with applicable building codes and <br />permit requirements. <br />1) Modular Field Afftce <br />MRV plans to install a modular office structure at a location adjacent and parallel <br />to the northwest side of the mill structure (see attached Figure 1). The proposed <br />structure is a 10'x44' self-contained mobile office trailer that will be utilized as <br />an onsite field office for mine management personnel. The unit is comprised of <br />office space onty and there are no internally plumbed facilities, thus there will be <br />no directly associated sandary facilities connected thereto (existing sanitary <br />facilities located elsewhere onsite will be utilized). ElecUical service will be <br />supplied via an extension from the mils building, consistent with Boulder Counfy <br />permit requirements and codes, as applicable. The unit will be painted a IigM <br />green and grey color to minimize visual impact. <br />2) Fuel Storage Facility <br />MRV plans to construct a fuel storage facility at a location approximately 125 feet <br />west of the mill structure along the Korth side of the mine service road (see <br />attached Figure 1). The proposed structure wiU consist of a single 2- <br />compartinent (250 gallons per compartment) Con-Vault °armor cast° (or <br />equivalent) fuel containment system. This sytem employs a concrete <br />encasement shell around a steel primary tank that affords overtill spilt protection <br />