Laserfiche WebLink
<br />RECLAMATION COST SUMMARY cont'd <br />N. EARTHWORK <br />Task No.~ <br />_.______I__~.__ <br />I <br />I <br />STREAM CHANNEL RECONSTRUCTION <br />Task Description <br />subtotal (H); <br /> <br />sheet 3 of 4 <br />Cost (f) <br />I. EARTN40RK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (f) <br />Subtotal (1): <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description <br />2 ~ respread 12"of topsoil <br />Cost (f) <br />530,894 <br />Subtotal (J); f30,894 <br />