Laserfiche WebLink
INTEROFFICE MEMORANDUM <br />TO: Dr\N HERNANUG'I. I\ <br />FROM: f ANCST NINNS \J / <br />SUBJECT: RRCIe\1L\'1'IO COST Tlbi<YP I~OR X200G-227-Ot <br />DATE: 8/10/2007 <br />CC: <br />I have completed a Reclamation cost estimate for NOI X2006-227-O1 for 6 twinned drill holes and pads for <br />Juniper Coal Company QCC) for the Big Elk Exploration Project <br />This estimate includes reclamation of 6 drill hole pads, sealing 12 drillholes (G twinned holes) and their <br />associated mudpits, 3000 linear feet of newly disturbed access roads, The division's used the drill seed <br />application rate. <br />The Division's reclamation cost estimate totaled $22,551.00. This represents the habihty associated with <br />conducting reclamation of the proposed work. JCC estimated the increase in reclamation costs would be <br />$2Q000.OQ however, they did not include costs for twinned holes (6 holes versus ]2 holes). Since the <br />application requests twinned holes, the Division includes costs associated with sealing 2 holes per drill pad. <br />Please have the applicant include costs for sealing the 6 additional holes. Or the applicant can incorporate the <br />Division's cost estimate into their application and use the Division's estimate. <br />