Laserfiche WebLink
During the development of North Mains beneath the DRG&W railroad spur and the <br />Yampa River, CEC will install three monitoring points as shown on Map 24. CEC <br />proposes to install these subsidence monitoring points over the main entries, with one <br />point adjacent to the railroad track, one south of the river, and one north of the river. <br />CEC proposes that these three points would be monitored semi-annually for one year <br />following development intercept, after which time they would no longer be required and <br />would automatically be dropped from the schedule. These points will merely serve to <br />confirm the lack of subsidence associated with main entry development. <br />TR 95-36 Ex 44-5 Revised 01 /16/95 <br />