Laserfiche WebLink
• ~~ <br />STAT~OF COLORADO <br />MINED LAND RECLAMATION DIVISION <br />Department of Natural Resources <br />7313 Sherman St.. Room 215 <br />Denver, CO 80203 <br />303 8663567 <br />FAx. 303 6328106 <br />December 20, 1991 <br />Demetrio and Olive Valdez <br />P.O. Box 184 <br />Conejos, CO 81129 <br />Re: Notice of Formal Public Hearing, A & S Construction Co., <br />Demetrio and Olive Valdez; File No. M-91-133 <br />Dear Mr. and Ms. Valdez: <br />Roy Romer. <br />Governor <br />Fretl R. Barra. <br />Orvision Director <br />It has come to our attention that an unpermitted mining operation may have <br />occurred on your property on the west side of the Rio San Antonio, about one <br />mile south of Antonito. The Colorado Mined Land Reclamation Act, C.R.S. <br />34-32-101 et se ., and specifically, 34-32-109(7), as amended, requires all <br />persons who mine in Colorado obtain a reclamation permit for their mining <br />operation. <br />The Mined Land Reclamation Division has placed you and your operation on the <br />Mined land Reclamation Board meeting agenda for consideration of possible <br />violation of the above mentioned statute. This meeting is scheduled for <br />January 22-23, 1992, in Room 318 of 1313 Sherman Street, Denver, Colorado, <br />commencing at 9:00 a.m. each day. Your matter will be heard during a Formal <br />Public Hearing as soon after commencement as possible. Please call this <br />office on Monday, January 20, 1992 for a more specific day and time. <br />During the Formal Public Hearing, the Board may issue or confirm a Cease and <br />Desist Order, consider possible civil penalties and corrective actions (if a <br />violation is found.) Civil penalties are levied pursuant to Article 32 of <br />Title 34, Section 123(2) and Section 123(3), which state: <br />(2) Any operator who operates without a permit shall be subject to a civil <br />penalty of not less than one thousand dollars per day nor more than five <br />thousand dollars per day for each day the land has been affected. Such <br />penalties shall be assessed for a period not to exceed sixty days. <br />Operators who mine substantial acreage beyond their approved permit <br />boundary may be found to be operating without a permit. <br />(3) Any operator or prospector who operates without filing a notice of intent <br />or a permit under Section 34-32-110 shall be subject to a civil penalty <br />of not less than fifty dollars nor more than two hundred dollars per day <br />for each day the land has been affected. Such penalties shall be <br />assessed for not less than one day and not more than sixty days. <br />Operators operating under a permit approved pursuant to Section 34-32-110 <br />who affect more than two acres may be found to be operating without a <br />permit. <br />111 IIIIIIIIIIIIIIII OF ~yCO~Q <br />tip. N7 <br />999 c -.;`.YRFkK, O <br />„%- o <br />.r 8y:~. <br />. r8 6 . <br />