My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-09-10_REVISION - M1992054
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1992054
>
1997-09-10_REVISION - M1992054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2021 7:52:50 AM
Creation date
11/21/2007 10:33:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992054
IBM Index Class Name
Revision
Doc Date
9/10/1997
Doc Name
CONSTRUCITON MATERIALS LIMITED IMPACT OPERATION 110 RECLAMATION PERMIT APPLICATION FORM
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-4- <br /> Maps & Exhibits: <br /> Submit TWO (2) complete, unbound copies of the following application exhibits: <br /> 6.3.1 EXHIBIT A - Legal Description and Location Map <br /> 6.3.2 EXHIBIT B - Site Description <br /> 6.3.3 EXHIBIT C - Mining Plan <br /> 6.3.4 EXHIBIT D - Reclamation Plan <br /> 6.3.5 EXHIBIT E - Maps <br /> 6.3.6 EXHIBIT F - List of Other Permits and Licenses Required <br /> 6.3.7 EXHIBIT G - Source of Legal Right-to-Eater <br /> 6.3.8 EXHIBIT B - Municipalities Within a Two-mile Radius <br /> 6.3.9 EXHIBIT I - Proof of Filing with County Clerk <br /> 6.3.10 EXHIBIT J - Proof of Mailing Notices of Permit Application <br /> 6.3.12 EXHIBIT L - Permanent Man-Made Structures <br /> 6.1.2(1) (b) ADDENDUM 1 - Notice Requirements (sample enclosed) <br /> 6.5 Geotechnical Stability Exhibit (as required) <br /> Responsibilities as a Permittee: <br /> Upon application approval and permit issuance, this application becomes a legally <br /> binding document. Therefore, there are a number of important requirements which <br /> you, as a permittee, should fully understand. These requirements are listed <br /> below. Please read and initial each reauirement, in the space provided, to <br /> acknowledge that you understand your obligations. If you do not understand these <br /> obligations then please contact this Office for a full explanation. <br /> 1. Your obligation to reclaim the site is not limited to the amount of the <br /> financial warranty. You assume legal liability for all reasonable expenses <br /> which the Board or the office may incur to reclaim the affected lands <br /> associated with your mining operation in the event your permit is revoked <br /> and financial warranty is forfeited; <br /> 2. The Board may suspend or revoke this permit, or assess a civil penalty, <br /> upon a finding that the permittee violated the terms or conditions of this <br /> permit, the Act, the Mineral Rules and Regulations, or that information <br /> contained in the application or your permit misrepresent important material <br /> (� yqqn, facts; <br /> V 3.. If your mining and reclamation operations affect areas beyond the <br /> boundaries of an approved permit boundary, substantial civil penalties, to <br /> Q� you as permittee can result;? 4. Any modification to the approved mining and reclamation plan from those <br /> described in your approved application requires you to submit a permit <br /> modification and obtain approval from the Board or Office; <br /> y �z A 5. It is your responsibility to notify the Office of a16y changes in your <br /> (� address or phone number; <br /> Qjj(l 6. Upon permit issuance and prior to beginning on-site mining activity, <br /> you must post a sign at the entrance of the mine site, which shall be <br /> clearly visible from the access road, with the following information (Rule- <br /> 3.1. 12) : <br />
The URL can be used to link to this page
Your browser does not support the video tag.