My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV12517
DRMS
>
Back File Migration
>
Revision
>
REV12517
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:23:29 AM
Creation date
11/21/2007 10:33:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
2/11/1998
Doc Name
MIDTERM REVIEW IDENTIFICATION OF INTEREST & RECLAMATION COST ESTIMATE
From
DMG
To
JIM BURNELL
Type & Sequence
MT1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DOZER COST d PERFORMANCE DATA WORKSHEET cont'd <br />Model: Cat D11N <br />ADJUSTED COST SUBTOTALS <br />sheet 2 of 2 sheets <br /> <br />I---••------••-----•--------- Ownership <br />Costs ••• I <br />•-•••-•--I••--------------- <br />-- Overhaul d Operating Costs ••-------••~~--~~~~~- <br />I Dozer. ROPS d Attachment 42: I Dozer d BOPS: <br />I Single shifts 554.24 525.26 524.15 56.04 556.74 57.08 546.06 526.68 511.26 50.00 55.75 <br />I Double shifts 540.68 512.63 512.07 Attachment M2: <br />Triple shifts 536.18 <br />I 58.41 58.04 50.88 54.43 <br />I 51.62 53.71 50.00 50.72 50.00 52.32 <br />HOURLY OPERATOR WAGES <br /> Base Fringe F.I.C.A Unempl. Wk.Comp. Total I Shift I <br />Labor Classification Rate Benefits 1.70% 6.20% 12.50% (S/hr)I Differential I <br />............................. <br />Dozer operator (< 70hp) ............. <br />514.32 .............. <br />53.96 ........... <br />51.10 ....... <br />50.89 ......... <br />51.79 .......I <br />522.06 I ..--~-~--~--~-~ I <br />Day 50.00 2 shift/day avg.: 50.15 <br />Dozer operator (Y10hp) 515.02 53.96 51.16 50.93 51.88 522.95 I Swing: 50.30 3 shift/day avg.: 50.25 <br />Mechanic 515.32 53.96 51.18 50.95 51.92 523.32 I Night: 50.45 I <br />HOURLY EpUIPNENT COST SUMMPRY <br />Ownership Operating d Overhaul Costs Operator I Total <br />Lasts Dozer Ripper Costs I Cost/HR (f) <br />Single shifts 5103.65 5159.61 513.68 522.95 5299.89 <br />Double shifts 565.39 1159.61 513.68 523.30 5261.78 <br />Triple shifts 552.63 5159.61 513.68 523.20 5249.12 <br />EQUIPMENT PERFORMANCE DATA <br />- - - EQUIPMENT SPECIFICATIONS - - - <br /> Horsepower Trans. Weight Length Nidth Heiqht Fuel Ripper <br /> Description (FHP) Type (tons) (ft.) (ft.) (it.) Type Type <br />MACHINE MAl(E d MODEL: Cat D11N 770 Powershift 87.7 21.5 12.4 14.9 diesel N/A <br />DOZER BLPDE: UNIVERSAL N/A N/A 17.0 N/A 20.8 7.6 N/A N/A <br />ATTACHMENT il: ROPS Cab N/A N/A N/A N/A N/A N/A N/A N/A <br />ATTACHMENT #2: 3-shank ripper <br />................. N/A <br />............. N/A <br />............ 11.8 <br />........ 5.2 <br />........ 10.9 <br />........ 3.5 <br />........ N/A <br />....... Adj. Parallelogram <br />..................... <br /> Total Wt.: 116.5 tons <br />
The URL can be used to link to this page
Your browser does not support the video tag.