My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV12517
DRMS
>
Back File Migration
>
Revision
>
REV12517
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:23:29 AM
Creation date
11/21/2007 10:33:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
2/11/1998
Doc Name
MIDTERM REVIEW IDENTIFICATION OF INTEREST & RECLAMATION COST ESTIMATE
From
DMG
To
JIM BURNELL
Type & Sequence
MT1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHEEL LOADER COST 8 PERFORMANCE DATA WORKSHEET cont'd <br />Model: CA7 992C (1993) <br />ADJUSTED COST SUBTOTALS <br />Shea[ 2 of 2 Sheets <br />I----••---••------------------ Ownership Costs --•--------------•------------ Overhaul 8 Operating Costs ------•--•----------- <br />I Loader. Attachments #1 8 #2: I Loader 8 Attachment #1: <br />I Single shifts 543.20 522.55 517.60 53.26 314.38 53.98 514.10 522.00 56.23 525.32 51.52 <br />I Double shifts 532.40 511.27 58.80 Attachment #2: <br />I Triple shifts 528.82 57.51 55.86 50.00 50.00 50.00 50.00 50.00 50.00 f0.OC 50.00 <br />I I <br />HOURLY OPERATOR WAGES <br /> Base Fringe F.I.C.A Unempl. Nk. Comp . Total I Shift I <br />Labor Classification Rate Benefits 7.705 6.20% 12 .50% (f/hr) Differential I <br />............................ <br />Loader operator (~-6cy) .............. <br />515.02 .........'.... <br />53.96 ....... •'.. <br />51.16 ........ <br />50.93 ... <br />51 .... <br />.88 ........ I <br />522.95 I ............... I <br />Day 50.00 12 shift/day avg.: 50.15 <br />Loader operator (> 6cy) 515.17 53.96 51.17 50.94 51 .90 523.13 I Swing: 50.30 13 shift/day avg.: 50.25 <br />Mechanic 515.32 53.96 51.18 50.95 61 .92 523.32 I Night: 50.45 <br />HWRLY EpUIPMENT COST SUMMARY <br /> I Ownership I ---Operating 8 Overhaul Costs--I Operator I Total <br /> I Costs I Loader. Att.#1 Attachment #2 I Costs I Cost/HR (i) <br /> <br />Single I <br />shifts I <br />583.35 <br />592.78 I I <br />f0.D0 I <br />523.13 <br />5199. <br />21 <br />Double shifts 552.48 592.18 50.00 523.28 5168. 54 <br />Triple shifts 542.19 592.78 50.00 523.38 5158. 35 <br />EWIPMENi PERFORMANCE DATA <br />- - EpUIPMENT SPECIFICATIONS - <br />I-----------••Dimensions (ft)----•••••--I <br />Machine Hake 8 Model I Transmission I Fuel Type I Horsepower I Length Width Height Height (tons) <br />...................... I ............... I .............. I ............ I ........... I .............. I ............ I ............... I <br />CAT 9920 (1993) Power shift Diesel 690.0 43.08 15.58 18.00 96.39 <br />..........................................................................................................................I <br />I Clearance I-Capacity (cu. yds.)-I Max. Loading I Basic Cycle Time I <br />I Type Circle (ft.) Struck Heaped I Height (ft) I (load, mnvr. dumD> <br />I ................I............-I---~-~~---I..........I..............I....................I <br />Loader Bucket: Rock w/teeth 71.25 11.20 13.50 13.66 0.7 min. <br />........................................................................................ I <br />GROUND SPEEDS (fpm) @ Rated Engine RPM <br />Transms. Gear: 1st 2nd 3rd 4th <br />................ I ............. I ........... I ....... I ....... I <br />forward: 378 669 1.144 N/A <br />reverse: 414 730 1.250 N/A <br />
The URL can be used to link to this page
Your browser does not support the video tag.