My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV12517
DRMS
>
Back File Migration
>
Revision
>
REV12517
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:23:29 AM
Creation date
11/21/2007 10:33:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
2/11/1998
Doc Name
MIDTERM REVIEW IDENTIFICATION OF INTEREST & RECLAMATION COST ESTIMATE
From
DMG
To
JIM BURNELL
Type & Sequence
MT1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO OIV[SION OF MINERALS ANO GEOLGGY <br />DOZER COST d PERFORMANCE DATA WORKSHEET <br />Machine Nake d Model: Cat D10N <br />Dozer Blade: SEMI-UN[VERSAL <br />Attachment ;1: ROPS Cab <br />Attachment ;2: N/A <br />Last Cost Revision: April, 1996 <br />BASE EQUIPMENT COSTS (CRG) <br />sheet 1 of 2 sheets <br />REFERENCES: 1) Cost Reference Guide (CRG) <br />2) Contractors Equipment Cost Guide (CECG) <br />3) Colorado Contractors Association <br />Wage Rate Schedule <br />d) Caterpillar Performance Handbook <br /> ~•--••------ Base Ownership d Overhaul Casts ••--- ------•~• ------- -----•• Base Operating Casts ---•--- --•• ~~~- <br /> ~ Ownership ~ Overhaul ~ Field Repair ~ <br /> ~ Depreciation CFC Overhead ~ Labor Parts Labor Parts ~ Fuel Lube Tires G.E .C. <br />Machine 526.93 511.46 511.25 55.27 524.11 56.17 519.56 518. 02 56.61 50.00 53 .26 <br />Attachment ;1 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50. 00 50.00 50.00 50 .00 <br />Attachment ;2 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50 .00 50.00 50.00 50 .00 <br />COST ADJUSTMENT FACTORS (CECG) <br />Factor Description Base Value Adj. Value Multiplier <br />Acquisition cost: 5649.705.00 5471.572.78 0.726 <br />Econ. life hrs.-machine: 15.350 11.500 1.335 <br />`attach. ;1: 11.000 11.000 1.000 <br />`attach. ;2: N/A N/A 1.000 <br />Annual use hours: 2.112 1.850 1.142 <br />Mechanic's labor cost: 521.15 523.32 0.859 <br />Fuel cost/gal.-gasoline: 51.16 51.16 1.000 <br />`diesel: 50.99 50.99 1.000 <br />Cube cast: 55.90 55.90 1.000 <br />Tire life hours: 0 0 1.000 <br />Tire factor: 0 0 1.000 <br />Tire cast: <br />......................... 50.00 <br />............... 50.00 <br />................ 1.000 <br />.......... <br />ADJUSTED EQUIPMENT COSTS <br />ACQUISITION COST BREAKDVdN <br />Cost Elements (CECG) Factor Adj. Cost <br />Base purchase price 5649.105. 00 <br />Less dealer discount 0.142 592.258. 11 <br />Plus freight 0.020 512.994. 10 <br />Plus dealer charges` 0.005 53,248. 53 <br />`NERD estimate <br />Adjusted purchase price 5513.669. 52 <br />Plus taxes: Sales @ 3X 511.210. 69 <br />SMM @2t 511.473. 19 <br />Less Lire cost 50. 00 <br />Less salvage value 0.228 5130.801. 21 <br />Net acquisition cost 5471,512.78 <br />............................................ <br /> ~-•• ••-•--• Adjusted Ownership d Overhaul Costs -- -----••~•• •----- --••• Adjusted Operating Costs --•--- -•----- <br />Acquisition cost 519.55 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A <br />Econ.life -Doter d ROPS 526.09 N/A N/A 57.03 532.18 58.24 526.11 N/A N/A N/A N/A <br />`Attach. ;2 N/A N/A N/A 50.00 50.00 50.00 50.00 N/A N/A N/A N/p <br />Annual usage 522.31 513.08 512.84 N/A N/A N/A N/A N/A N/A N/A N/A <br />Double shifts 519.57 56.54 56.42 N/A N/A N/A N/A N/A N/A N/A N/A <br />Triple shifts 517.40 54.76 54.28 N/A N/A N/A N/A N/A N/A N/A N/A <br />Mech.labor-Doter d BOPS N/A N!A NfA 36.04 N!A 57.08 N!A N/A N/A NIA N/A <br />`Attach. ;2 N/A N/A N/A 50.00 N/A 50.00 N/A N/A N/A N/A N/A <br />Fuel /l ube `Dozer d ROPS N/A N/A N/A N/A N/A N/A N/A 518.02 56.67 50.00 53.26 <br />•Attath. ;2 N/A N/A N/A N/A N/A N/A N/A 50.00 50.00 50.00 50.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.