My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989-06-01_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1989-06-01_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2021 6:05:43 AM
Creation date
11/21/2007 10:33:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
6/1/1989
Doc Name
SAN LUIS PROJECT FN M-88-112 REQUEST FOR TR TO EMERGENCY RESPONSE PLAN
From
STEFFEN ROBERTSON & KIRSTEN
To
MLRD
Type & Sequence
TR1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />2. Put on proper body and face protection, and breathing <br />apparatus, if necessary. <br />3. Attempt to stop or contain the flow of material. <br />4. Administer first aid and medical treatment in accordance <br />with Section 6.0, if necessary. <br />5. Notify immediate Supervisor or the Safety Training <br />Supervisor. Supervisors are to report directly to the <br />Mill Superintendent or. acting Duty Officer. The Mill <br />Superintendent will take further corrective and <br />notification actions, if necessary. <br />6. Begin detoxification activities, if necessary. <br />7. Begin clean-up activities. <br />8. Implement spill and spill-path monitoring, if necessary. <br />Table 7.4 lists proper protection, clean-up and monitoring for <br />heap leach reagents. <br />The above outline does not represent a complete list of <br />actions, and incident-specific responses will be required. Incident <br />specific responses to be established will include evaluation of spill <br />and spill-path monitoring requirements and evaluation of spill <br />notification requirements. These responses are discussed in Section <br />8.0. <br />Complete copies of the Spill Prevention and Emergency Response <br />Plan, can be found at the following locations: <br />I. Administration Building (Mine Site) <br />a. General Mine Superintendent's Office <br />b. Safety and Training Supervisor's Office <br />2. Maintenance Office <br />3. Mill Office <br /> <br />-13 (Revised 4/20/89) <br />
The URL can be used to link to this page
Your browser does not support the video tag.