My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE23870
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE23870
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:32:56 PM
Creation date
11/21/2007 10:33:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
6/4/1992
From
JOHN SHOMAKER INC
To
NORA JACQUEZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JOHN W. SHOMAKE • NC. • <br />GEOLOGY-HYDROGEOLOGY <br />2703 BROADBENT PARKWAl' NE, SUITE D <br />ALBUQUERQUE, NEW A1EXIC0 87107 <br />(505) 3453407 <br />PROPOSED WORK PLAN FOR WATER QUALITY MONITOF#ING <br />John W. Shomaker, Inc. and professional associates will conduct <br />routine monitoring of water quality parameters at speqcified <br />points within the drainage basin affected by the Bat~le Mountain <br />gold mining operations. The precise parameters to b monitored <br />will be defined by the parties involved at the onset~of the <br />contract, and will ensure compliance with all state f Colorado <br />and U.S. Environmental Protection Agency standards. (Project <br />staff from John W. Shomaker, Inc. will work with the parties <br />involved to provide technical guidance in identifyin and <br />selecting these parameters. In order to facilitate eaningful <br />data collection by all parties, John W. Shomaker, In and <br />professional associates propose that: <br />(a) Specified sampling sites be designated where a111~~ water <br />quality samples are to be collected on a regula>'# basis. <br />(b) Sampling conducted by all parties will be done egularly at <br />a uniform time and date to avoid any discrepanc'es between <br />collected samples. Sampling frequency will be efined by <br />the parties involved at the onset of the contra t. Ensuring <br />uniformity in the timing and frequency of sampling, and in <br />the parameters analyzed, will eliminate any pos ible <br />conflicts in the comparison of methodologies. <br />(c) Collected samples will be stored in a laborator certified <br />container, and delivered within 24 hours to an F~PA-certified <br />laboratory for analysis of all parameters. <br />(d) The laboratory analysis will be interpreted by ppropriate <br />project staff to identify and describe any pote tial adverse <br />environmental impacts which may be evident, and to describe <br />suitable corrective measures which should be to en to <br />mitigate these adverse impacts. <br />(e) Copies of the laboratory analysis and interpretation of data <br />will be delivered immediately for review and co ment by the <br />parties involved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.