Laserfiche WebLink
<br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenl of Nanual Resources <br />1 }1 }Sherman 51., Room 21 S <br />Denver, Colarario AO?03 <br />Phone: (]03) A66~]56? <br />FAX: (30]I 8]2-810h <br />May 14, 1999 <br />Mr. Erich Bower <br />Climae Molybdenum Company <br />1930? County Road #3 <br />Parshall, CO 80468 <br />RE: Acreage Reduction Inspection, Henderson iVline and Nlill, <br />Revision No. AR-Ol, Permit No. M-77-342 <br />Dear Mr. Bower: <br />DIVISION OF <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MINING•SAFETY <br />Bil I Owent <br />Governor <br />Greg E. Walther <br />Executive DveUOr <br />Michael B Long <br />Division Dheaor <br />On March 15, 1999 the Division of Minerals and Geology received the above referenced Acreage <br />Reduction revision. As we have discussed, current ground conditions would make the location of the <br />acreage reduction difficult to access at this time. As such, the Division is unable to inspect the site <br />within the 60-day time limit specified in Rule 4.16.1(5) and hereby notifies Climax Molybdenum <br />Company that the site will be scheduled for inspection when ground conditions permit. This extension <br />of the 60-day timeframe is provided for in Rule 4.16.1(5). As we have discussed, you will advise the <br />Division when ground conditions improve. <br />Your continued cooperation is appreciated. Please call if you have any questions. <br />Sincerely, <br />G l`ei~ ~` <br />Allen C. Sorenson <br />Reclamation Specialist <br />cc: Carl Mount, DMG <br />c'\windaws\penonal\\hendeaon weather lettte[.doc <br />